Provides that in the siting of new electric transmission facilities, priority shall be given to major electric transmission facilities that are proposed to be sited in existing rights-of-way including those owned by an electric corporation or distribution utility, or by the state, including any subdivision thereof, or a state public authority, for state highway or transportation purposes, and railroad corridors.
Relates to transparency and other requirements for applications submitted to ORES for siting of major renewable energy and major electric transmission facilities.
This bill allows the New York State Department of Environmental Conservation to enter into agreements or easements on state-owned reforestation lands to help connect renewable energy projects located outside those areas to the power grid. The legislation ensures that any such agreements will not disrupt the primary purposes of the reforestation areas, such as conservation and timber management. All agreements made under this authority must be recorded and made publicly available on the Department's official website. The bill takes effect immediately upon passage.
Requires the office of renewable energy siting and electric transmission to establish and/or amend rules and regulations pertaining to standards related to the siting, design, construction and operation of major renewable energy facilities; requires such rules and regulations to include information relating to farmland protection and application procedures; provides for the repeal of such provisions upon expiration thereof.
Authorizes ORES to issue siting permits for battery energy storage systems for use by data centers, regardless of the expected storage or transmission capacity of such battery energy storage systems, and whether or not such battery energy storage systems will be co-located with renewable energy systems; requires data centers to submit carbon reduction plans.
Enacts the accelerate solar for affordable power (ASAP) act to set a new target for distributed solar energy capacity and direct the public service commission to advance reforms to the utility interconnection process to ensure timely and cost-effective integration of new distributed energy resources.
Relates to transparency and other requirements for applications submitted to ORES for siting of major renewable energy and major electric transmission facilities.
Enacts the accelerate solar for affordable power (ASAP) act to set a new target for distributed solar energy capacity and direct the public service commission to advance reforms to the utility interconnection process to ensure timely and cost-effective integration of new distributed energy resources.
S 8512 (the "Solar UP Now NY Act") defines "portable solar generation devices" as moveable photovoltaic systems under 1,200 watts that connect via standard outlets to offset household electricity use. It exempts these devices from utility interconnection rules and net metering requirements, meaning customers don’t need utility approval, pay fees for grid feedback, or install extra equipment. The bill directly affects residential and small commercial users who want to use simple portable solar units without regulatory hurdles. Utilities cannot be held liable for damage from these devices, and the law takes effect immediately.
Provides that in the siting of new electric transmission facilities, including high-voltage transmission lines, the following corridors shall be utilized in the following order of priority in accordance with feasibility of economic and engineering considerations, reliability of the electric system and the protection of the environment: existing utility corridors; highway (interstate, freeway and state trunk) and railroad corridors; recreational trails, to the extent that the facilities may be constructed below ground and that the facilities do not significantly impact environmentally sensitive areas; and new corridors; provides that the commissioner of transportation shall engage in coordination activities with a utility or transmission line developer to review requested highway corridors for possible permitted locations of transmission lines.