Relates to the siting of new electric transmission lines
Summary
Provides that in the siting of new electric transmission facilities, including high-voltage transmission lines, the following corridors shall be utilized in the following order of priority in accordance with feasibility of economic and engineering considerations, reliability of the electric system and the protection of the environment: existing utility corridors; highway (interstate, freeway and state trunk) and railroad corridors; recreational trails, to the extent that the facilities may be constructed below ground and that the facilities do not significantly impact environmentally sensitive areas; and new corridors; provides that the commissioner of transportation shall engage in coordination activities with a utility or transmission line developer to review requested highway corridors for possible permitted locations of transmission lines.
Bill status
in committee
1 of 4 stages cleared
Introduction
May 2025
Committee Review
Floor Vote
Governor
Introduced May 15, 2025
Last action Apr 30, 2026
Maddy AI version diff · 1 comparison
What changed between versions
S8114
→
S8114A
·
4 edits
MODERATE
The bill was amended to streamline its committee review process and significantly expand the requirements for placing new electric transmission lines on existing utility corridors. The changes mandate that existing utility corridors be made available to new transmission projects on a nondiscriminatory basis with just compensation, ensuring fair access regardless of whether the current corridor owner is involved in the new project.
Scope change
The bill's scope regarding transmission siting was expanded to include mandatory access provisions for existing utility corridors, while the procedural scope was adjusted to simplify committee recommitment rules.
REQUIREMENT
Added a requirement that existing utility corridors must be made available to new transmission entities with just compensation, reasonable terms, and due process oversight.
ELIGIBILITY
Clarified that access to existing utility corridors applies nondiscriminatorily to any selected entity, even if they are not the current corridor owner.
TIMELINE
Changed the committee review timeline for denied transmission requests to be submitted to the chairs and ranking minority members of both Senate and Assembly committees, as well as the Public Service Commission chair.
TECHNICAL
Updated the bill title and committee status to reflect that the bill was amended and recommitted to the Committee on Energy and Telecommunications.
Floor votes
How they voted
No floor votes recorded yet.
Full legislative history
Actions timeline
Total actions
4
Key actions
2
Committee
2
Amendments
2
Apr 30, 2026
Upper · Passed
PRINT NUMBER 8114A
upper
Apr 30, 2026
Upper · Passed
AMEND AND RECOMMIT TO ENERGY AND TELECOMMUNICATIONS
upper
Jan 7, 2026
Committee
REFERRED TO ENERGY AND TELECOMMUNICATIONS
upper
May 15, 2025
Committee
REFERRED TO ENERGY AND TELECOMMUNICATIONS
upper
1 primary · 0 co-sponsors
Sponsors
Role
Legislator
Party
State
District
P
Jeremy Cooney
DDemocratic/Working Families
Ask Maddy
·
AI policy assistant
Ask Maddy about S 8114
Scope: NY
Hi! I can help you understand S 8114. What would you like to know?
Try one of these
i
Maddy answers using official bill text and legislative records. Always verify before sharing.
Sources cited inline