Provides that in the siting of new electric transmission facilities, priority shall be given to major electric transmission facilities that are proposed to be sited in existing rights-of-way including those owned by an electric corporation or distribution utility, or by the state, including any subdivision thereof, or a state public authority, for state highway or transportation purposes, and railroad corridors.
Requires gas corporations to file maps with the public service commission annually to assess leak-prone gas infrastructure and the decommissioning of such leak-prone gas lines; requires the public service commission to publish such maps and certain accompanying documents on the commission's website; directs the public service commission to designate neighborhood priority decarbonization zones.
Requires gas corporations to file a plan with the public service commission addressing aging or leaking pipelines within their service territory; outlines plans for the replacement of such pipelines.
Provides that in the siting of new electric transmission facilities, including high-voltage transmission lines, the following corridors shall be utilized in the following order of priority in accordance with feasibility of economic and engineering considerations, reliability of the electric system and the protection of the environment: existing utility corridors; highway (interstate, freeway and state trunk) and railroad corridors; recreational trails, to the extent that the facilities may be constructed below ground and that the facilities do not significantly impact environmentally sensitive areas; and new corridors; provides that the commissioner of transportation shall engage in coordination activities with a utility or transmission line developer to review requested highway corridors for possible permitted locations of transmission lines.
Directs the public service commission to evaluate hydrogen, sewage thermal energy, and nuclear small modular reactors as renewable energy sources and report the results of such evaluation to the governor and the legislature.
Requires gas pipeline facilities to accelerate the repair, rehabilitation, and replacement of equipment or pipelines that are leaking or at a high risk of leaking; requires the public service commission to establish a standard definition and methodology for calculating and reporting unaccounted-for gas.
Enacts the credit for rural energy infrastructure act of 2025, to provide tax credits for certain activities expanding energy infrastructure into unserved rural areas.