Issue · Energy

Energy

Every energy bill, vote, and legislator stance in Colorado, automatically classified by Maddy, our AI policy reader.

Total bills
25
2026 Regular Session
Top supporter
Javier Mabrey
100% support rate
Top opponent
Scott Bottoms
11% support rate
Ranked legislators
10
5 support · 5 oppose
Key legislators

Who's moving energy in Colorado

Legislators moving energy in Colorado
Legislator Party Stance Support rate Votes
Javier Mabrey
Javier Mabrey House · District 1
D
Strong +
100% 61
Alex Valdez
Alex Valdez House · District 5
D
Strong +
95% 70
Andy Boesenecker
Andy Boesenecker House · District 53
D
Strong +
95% 90
Emily Sirota
Emily Sirota House · District 9
D
Strong +
94% 71
Katie Stewart
Katie Stewart House · District 59
D
Strong +
94% 68
Scott Bottoms
Scott Bottoms House · District 15
R
Strong −
11% 65
Tony Hartsook
Tony Hartsook House · District 44
R
Strong −
11% 78
Ava Flanell
Ava Flanell House · District 14
R
Strong −
12% 59
Rebecca Keltie
Rebecca Keltie House · District 16
R
Strong −
12% 63
Larry Suckla
Larry Suckla House · District 58
R
Strong −
15% 89
Showing 11–20 of 25 bills

All energy bills

signed · Colorado · House Jun 4, 2026

HB 1226: Manage Emissions from Electric Generating Units

The act requires the division of administration in the department of public health and environment (division), no later than July 2029, to propose a final rule (rule) establishing certain limits on the emission of nitrogen oxides and sulfur dioxide (emission limits) from an electric generating unit (unit) that is owned or operated by an electric utility; is located in the state; and emitted 200 tons or more of nitrogen oxides, or sulfur dioxide, or both in calendar year 2024 (covered unit). The rule must require compliance with the emission limits as soon as practicable after December 31, 2034, and must not cover units that, before December 31, 2029, have ceased operations; burn natural gas, fuel oil, or both only; or have certain systems installed. A unit that operates after December 31, 2034, must install certain pollution controls and comply with the emission limits on or before December 31, 2034.     An owner or operator of a unit is required to provide quarterly emission reports showing compliance with the rule to the division. On August 1, 2029, the air quality control commission in the department of public health and environment (AQCC) must submit to the general assembly a list of any units that are subject to a federal order. If there are any units subject to a federal order, the AQCC must also submit to the general assembly recommendations on whether to amend the requirements for units subject to federal order.     An investor-owned utility or wholesale electric cooperative that is the owner or operator of a unit is required, beginning 150 days after the issuance of a federal order requiring the unit to remain operating after the unit was scheduled to retire (order) and continuing every 90 days until the order is no longer in effect, to file a report with the public utilities commission (commission) that contains certain information about the costs to operate the unit and the amount of electricity generated by the unit. The commission must make these reports publicly available. An investor-owned utility is also permitted to submit an application for a financing order to recover the costs of complying with an order.     Any decision by the commission approving or modifying a portfolio in an electric resource plan of an investor-owned utility serving more than 500,000 customers must approve an amount of accredited capacity that allows the investor-owned utility to reliably achieve certain retirement and carbon dioxide emission reduction requirements. This requirement applies to an investor-owned utility serving more than 500,000 customers until the division determines that the investor-owned utility has achieved certain carbon dioxide emission reductions or until the investor-owned utility has retired all covered units, whichever is later.(Note: This summary applies to this bill as enacted.)
Sub-Topics Oil & Gas Air Quality
signed · Colorado · House Jun 1, 2026

HB 1225: Distributed Energy Resources Requirements

Under current law, each subscriber to a community solar garden receives a net metering credit to their electric bill. The community solar subscriber organization can choose between a fixed bill credit or a bill credit that is adjusted annually. The act states that, on and after October 1, 2026, a subscriber organization may choose a fixed bill credit for the subscriber organization's income-qualified subscribers and a bill credit that changes annually for the subscriber organization's other customers. The public utility providing the bill credit must adjust the fixed bill credit annually to ensure that the credit remains aligned with changes in electricity rates over time.     A public utility is permitted under current law to recover its prudently incurred costs to facilitate a timely interconnection of a distributed energy resource. The act prohibits a public utility from requiring an interconnection customer to pay the costs associated with interconnection facilities and upgrades until 30 days before the public utility incurs the costs. The act allows a public utility to require an interconnection customer to provide security for the estimated full costs of interconnection at the time of mutual execution of an interconnection agreement.     The act requires a public utility with more than 500,000 customers in the state to, on or before August 15, 2026, convene a working group to accelerate distributed generation interconnection. The working group is tasked with discussing, if applicable, a cluster and batch study process for interconnection studies and a process for the public utility to accept a surety bond for interconnection upgrade work. The working group is also directed to discuss, and the public utility is required to implement, a process for third-party interconnection studies and upgrades.     On or before December 15, 2026, the public utility is required to file a notice with the public utilities commission (commission) that includes a report on any recommendations of the working group. The public utility is directed to make appropriate filings to implement any recommendations of the working group that require commission approval on or before January 1, 2027.     The act specifies that any interconnection upgrades and related utility construction work performed by a contracted third party must meet applicable safety, reliability, labor, and technical standards.     The act amends the definition of 'dispatchable distributed generation' and requires the commission to evaluate the size of off-site renewable distributed generation or storage facility and installation limitations as part of a future renewable energy standard compliance plan.(Note: This summary applies to this bill as enacted.)
in committee · Colorado · Senate May 12, 2026

SB 82: Local Government Renewable Energy Development Fee

A renewable energy project developer (facility owner) that intends to undertake a project to build a renewable energy facility (renewable energy project) may currently submit an application for land use approval from the renewable energy project to a local government. However, current law does not specify what process a local government may use to charge fees or set a timeline for the local government to make a final decision regarding land use approval for the renewable energy project. The bill specifies that control over the specifics of the application process rests with the local government. The local government may establish fees for an application for a renewable energy project and may offer two independent tracks for the application based on the fee the facility owner pays. The standard track allows a facility owner to pay a lower fee, but does not guarantee a specific timeline for the local government to issue a final decision on the application. The expedited track allows a facility owner to pay an additional fee, with an agreement that if the local government takes longer than 120 days, minus any permitted tolling periods, a percentage of the higher fee will be refunded.     The bill gives local governments authority to contract with third-party technical reviewers to review the application for a final decision. The bill also requires a facility owner to pay a success fee to the local government upon final approval of the project, based on the amount of time between receipt of the application and when the project is approved, to be used by the local government for expenses related to regulating renewable energy facilities and maintaining local roads impacted by facility construction.(Note: This summary applies to this bill as introduced.)
Sub-Topics Renewable Energy
signed · Colorado · House May 27, 2026

HB 1268: Renewable Energy Development on Disturbed Lands

The act authorizes a local government with permitting authority over land uses (local government) to designate one or more areas within the jurisdiction of the local government as renewable energy reinvestment areas for the siting of renewable energy and energy storage system projects (eligible projects). In designating an area as a renewable energy reinvestment area, the local government must hold at least one public hearing and hold at least one public hearing for any construction permit applications required for a proposed eligible project in the renewable energy reinvestment area or must designate the area as part of an urban renewal plan or county revitalization plan and ensure that any outreach to and engagement of disproportionately impacted communities is consistent with statutory requirements. A local government cannot designate an eligible site within tribal lands without first consulting with the tribe with jurisdiction over the lands.     If an eligible project is sited in a renewable energy reinvestment area, an urban renewal authority or county revitalization authority (authority) may distribute tax increment revenue to finance or reimburse costs associated with the eligible project if the renewable energy reinvestment area is included in the authority's urban renewal plan or county revitalization plan.     In response to a request made by a local government or an eligible project developer for information regarding a designated renewable energy reinvestment area, a utility is required to acknowledge the request and provide the requestor readily available information within 30 days after the request is made.     The Colorado energy office is required to consolidate, publish on its website, and periodically update technical and informational resources concerning the process for siting, permitting, and developing eligible projects in renewable energy reinvestment areas.(Note: This summary applies to this bill as enacted.)
in committee · Colorado · House Feb 19, 2026

HB 1129: Gas Utility Service

The bill requires a gas distribution utility (utility) to exempt carbon dioxide emissions resulting from the combustion of gas by residential customers from the utility's clean heat plan filed with the public utilities commission (commission). A utility must exclude residential carbon dioxide emissions from the baseline and projected emissions calculations used in the utility's clean heat plan.     If a utility has already submitted a clean heat plan to the commission prior to the effective date of the bill, the utility may submit a revised clean heat plan to the commission that excludes residential carbon dioxide emissions from the utility's baseline and projected emissions calculations. The bill requires the commission to adopt rules that allow a utility to submit a revised clean heat plan.     The bill permits a utility to recover costs related to a system safety and integrity project, which is defined as a certain type of project that improves the safety or integrity of the gas distribution system.     The bill repeals a prohibition on a gas utility providing incentives to customers for establishing gas service to a property.(Note: This summary applies to this bill as introduced.)
in committee · Colorado · House May 7, 2026

HB 1030: Data Center & Utility Modernization

The bill creates the data center development and incentive program (program) operated by the Colorado data center development authority (authority), which is newly created in the Colorado office of economic development (office) ( section 1 of the bill). The authority consists of 9 members, as follows:2 members appointed by the governor with the consent of the senate;The director of the Colorado energy office or the director's designee;One member who has experience in water projects or water resource management, appointed by the president of the senate;One member who has experience in clean and renewable energy, appointed by the speaker of the house of representatives;2 members who have experience in data center development, with one member appointed by the speaker of the house of representatives and one member appointed by the president of the senate;One member representing a statewide organization that represents workers in trade crafts who construct data centers, appointed by the speaker of the house of representatives; andOne member representing a statewide organization that represents contractors who construct data centers, appointed by the president of the senate.To incentivize efficient data center development, the program allows a 100% state sales and use tax exemption on qualified purchases to the operator of a certified data center. To be eligible for certification, the operator of the data center, or a data center operator collectively with participating data center tenants, must:Have initiated a preliminary consultation with the utility that will provide electricity for the data center project regarding interconnection feasibility, capacity, and infrastructure requirements;Commit to making a $250 million minimum investment in data center infrastructure within 5 years;Commit to creating new full-time jobs, including employees and long-term service and maintenance positions, that satisfy specified criteria and breaking ground on the data center project within 2 years of obtaining certification;Commit to complying, and ensure that the utility that provides electricity to the data center also complies, with craft labor requirements, apprenticeship utilization requirements, and prevailing wage requirements; andCommit to obtaining certification under one of several energy efficiency standards, implementing water stewardship strategies that optimize operational water management, ensuring that all backup power generation associated with the data center project meets specified requirements, and consulting with the department of natural resources.To obtain certification, a data center operator must apply to the authority in a form and manner to be determined by the authority. The authority is required to review a data center operator's application for certification and may award certification to a data center operator that has demonstrated that it will satisfy the certification criteria ( section 1 ).A data center operator that obtains certification for a data center project is eligible for a 100% state sales and use tax exemption on the purchase and use of qualified data center infrastructure and systems for 20 years from the date that the data center project was certified, so long as the data center satisfies ongoing post-certification requirements and submits annual compliance reports to the authority. As long as the data center meets post-certification requirements as demonstrated in the annual compliance reports, a data center operator of a certified data center may apply to the authority for an extension of the sales and use tax exemption for an additional 10 years. If the authority determines that a data center operator is not fulfilling its obligations and commitments to retain certification, the authority may revoke the certification and the data center operator is required to repay the state for the sales and use tax benefits that it received ( sections 1 and 5 ). The exemption for a certified data center does not apply to local sales and use taxes unless the exemption is expressly included at the time of adoption or amendment of the local sales tax ordinance or resolution ( section 4 ).The bill allows a utility regulated by the public utilities commission (commission) to submit a targeted resource acquisition application to the commission to propose methods of meeting emerging large-load customer needs. The bill also specifies how a utility may finance resource and infrastructure needs in connection with emerging large-load customers ( section 3 ).(Note: This summary applies to this bill as introduced.)
signed · Colorado · Senate Apr 20, 2026

SB 21: Clean Fleet Enterprise Replace Aging Diesel Trucks

The act authorizes the clean fleet enterprise (enterprise) to incentivize, support, and accelerate the replacement of a truck that is part of a fleet and that is powered by a diesel-fueled internal combustion engine, is a model year of 2009 or earlier, and is registered, operable, and capable of independent roadway operation (aging diesel truck) with a diesel truck that is a model year of 2018 or later (new diesel truck) until December 31, 2031. The act also allows the enterprise to provide funding or financing through grant programs, rebate programs, revolving loan funds, or other strategies to help owners and operators of aging diesel truck fleets finance the replacement of aging diesel trucks with new diesel trucks to reduce the up-front costs of acquiring new diesel trucks until December 31, 2031.     The enterprise may use the clean fleet enterprise fund to provide money to support the replacement of aging diesel trucks with new diesel trucks, but the enterprise is required to ensure that it does not expend more than 20% of the fund's income during a state fiscal year for the support.     To qualify for any money provided by the enterprise for the replacement of aging diesel trucks with new diesel trucks, the act requires a purchaser of the new diesel truck to surrender an aging diesel truck to the seller of the new truck. The seller of the new diesel truck must decommission the aging diesel truck by drilling a hole in the engine's block and cutting the chassis rails in half. The seller must be an authorized dealer of new diesel trucks who must certify that the new diesel truck meets all state and federal emissions and safety standards for its model year.     The enterprise must prioritize applications to replace aging diesel trucks from businesses that are privately owned, independently owned, or have limited access to capital. The enterprise is not allowed to accept an application from the owner or operator of a motor vehicle fleet that owns, leases, or operates more than 50 heavy-duty motor vehicles or from a business entity with annual gross revenue exceeding $100 million. The enterprise is required to prioritize the replacement of an aging diesel truck that has a model year of no later than 2006.     The act expands the business purpose of the enterprise to include providing incentives and support for refrigerated transport units powered by zero emission technology. The act allows the enterprise to exercise its rights and powers without regard to the state 'Procurement Code'.     The act requires the enterprise to annually prepare a report that includes the estimated pollution reduction benefits of the enterprise. The enterprise must seek to ensure that all projects funded by the enterprise achieve measurable results and outcomes.(Note: This summary applies to this bill as enacted.)
passed · Colorado · Senate May 12, 2026

SB 45: Nuclear Workforce Development & Education Program

The bill creates the Colorado nuclear workforce development and education council (council) in the Colorado school of mines to help meet growing workforce demand in the nuclear energy sector. The bill establishes a related grant program (grant program) to provide grants to institutions of higher education for the development or expansion of nuclear engineering degree or certificate programs or course offerings. The council shall convene advisory sessions with stakeholders from the nuclear, educational, and workforce development sectors; implement the grant program; and contract with one or more third-party entities for staffing and operational assistance.     The council may seek, accept, and expend gifts, grants, and donations for council-related purposes. The state treasurer shall credit the gifts, grants, and donations to the Colorado nuclear workforce development and education cash fund (cash fund), which is created in the bill. The general assembly shall not appropriate general fund money to implement or maintain council operations or grant awards. The council shall convene and begin awarding grants only after the balance of the cash fund reaches or exceeds $500,000 (threshold) .     The bill imposes requirements to report to the Colorado commission on higher education and the general assembly about the council's funding sources, grant program implementation, and other uses of the grant program money. If the cash fund balance does not reach the threshold on or before September 1, 2027, the council is repealed and the money in the cash fund is refunded to the grantors or donors. Otherwise, the bill repeals the council, effective September 1, 2033, unless the council is extended following a sunset review.(Note: Italicized words indicate new material added to the original summary; dashes through words indicate deletions from the original summary.)(Note: This summary applies to the reengrossed version of this bill as introduced in the second house.)
Sub-Topics State Budget Nuclear
signed · Colorado · House May 7, 2026

HB 1007: Improve Customer Use Distributed Energy Resources

The act defines, and creates requirements for, portable-scale solar generation devices. In addition, the act prohibits a provider of retail electric service or wholesale energy from, among other things, requiring a customer to obtain the provider's approval before installing or using a portable-scale solar generation device. The act also prohibits a person from directly or indirectly unreasonably prohibiting the installation, use, or operation of a portable-scale solar generation device. A covenant or restriction that explicitly or indirectly unreasonably prohibits or restricts the installation, use, or operation of a portable-scale solar generation device is unenforceable and void as a matter of public policy, though a real property owner may require reasonable restrictions.     The act clarifies that a portable-scale solar generation device is considered an energy efficiency measure on and after January 1, 2027, and a unit owners' association of a common interest community is therefore not permitted to prohibit the installation or use of a portable-scale solar generation device. However, a real property owner that resides in a common interest community and installs a portable-scale solar generation device may be required to reasonably secure the device to their unit and may be responsible for all liability and costs associated with the device's installation, maintenance, or removal.     The act specifies that a provider of retail electric service or wholesale energy is not liable for any damage caused by a portable-scale solar generation device and requires that the installation of a portable-scale solar generation device be in accordance with fire code requirements and applicable building codes that pertain to health and safety.     Under current law, a utility that is subject to regulation by the public utilities commission (commission) must allow for customer ownership and use of a meter collar adapter through the utility's interconnection standards. The act requires the commission, on or before December 31, 2026, to revise existing commission interconnection rules to explicitly require commission-regulated utilities to:Maintain a public list of at least one approved meter collar adapter;Have a process for approving a meter collar adapter that is not included in the public list;Approve proposed meter collar adapters that meet certain technical requirements;If the installation of an approved meter collar adapter requires relocation of the meter enclosure or replacement of the meter housing, provide an estimate of costs associated with this work upon request of the customer;Establish and publish a process for a customer to request and install a meter collar adapter; andFacilitate the installation of a meter collar adapter by a registered electrical contractor and require that all electrical work be performed by a qualified party such as a master electrician.     In addition, the act states that the revised commission interconnection rules must allow commission-regulated utilities to require that installation work for a meter collar adapter be performed by the commission-regulated utility, a licensed electrical contractor, or a party approved by the commission-regulated utility if the installation of an approved meter collar adapter requires removal of the meter.     The act requires cooperative electric associations and customer-generators to comply with the rules adopted by the commission regarding meter collar adapters and with other commission rules regarding production meters.     Similarly, the act requires municipally owned utilities to:Maintain a public list of at least one approved meter collar adapter;Have a process for approving a meter collar adapter that is not included in the public list;Approve proposed meter collar adapters that meet certain technical requirements;If the installation of an approved meter collar adapter requires relocation of the meter enclosure or replacement of the meter housing, provide an estimate of costs associated with this work upon request of the customer; andInclude a process for a customer to request and install a meter collar adapter. (Note: This summary applies to this bill as enacted.)
in committee · Colorado · Senate Feb 17, 2026

SB 33: Clean Energy Permitting Processes

The bill creates the Colorado clean energy permitting coordination office (office) in the Colorado energy office to provide coordination and technical assistance to owners or operators, local governments, and state permitting authorities regarding permitting for the construction, expansion, repowering, or material modification of a clean energy resource facility project (covered clean energy project).At the request of the owner or operator of a covered clean energy project (owner or operator) or a local government with jurisdiction over the covered clean energy project or that the owner or operator determines is likely to experience direct and significant impacts from the covered clean energy project (host community), the office must convene a meeting (application coordination meeting) to coordinate the filing of permit applications for the covered clean energy project that includes certain interested parties. Following an application coordination meeting, the office must prepare a coordinated permitting schedule for the covered clean energy project that identifies the permits and approvals likely to be required for the covered clean energy project and certain other information (coordinated permitting schedule).The office is required to develop and maintain a public dashboard (public dashboard) on the office's website for an owner or operator that receives a coordinated permitting schedule or that receives state technical assistance from the office.Effective July 1, 2027, at least 90 days before the owner or operator submits the first state permit application for a covered clean energy project, the owner or operator must submit a community engagement plan to the office and relevant state permitting authorities. A community engagement plan must identify host communities for the project and describe certain other community engagement efforts regarding the project.Effective July 1, 2027, an owner or operator must prepare a community benefit agreement and submit the community benefit agreement to the office and the parties participating in the covered clean energy project's application coordination meeting. The office is required to develop model community benefit agreement terms for a covered clean energy project and post the terms on the covered clean energy project's public dashboard or the office's website.The office is required to prioritize technical assistance and permitting readiness support for covered clean energy projects that repower or reuse retired or retiring fossil fuel generation sites, are located in coal transition communities, or are located on brownfield sites. On or before December 1, 2027, the office shall publish and update annually an inventory identifying coal plant and industrial sites and brownfield sites suitable for redevelopment for clean energy resource facilities and other key infrastructure considerations.Effective July 1, 2027, an owner or operator must develop and submit to the office a safety and emergency preparedness plan and coordinate with relevant local emergency management agencies and the Colorado division of homeland security and emergency management in implementing the safety and emergency preparedness plan. The office shall post a safety and emergency preparedness plan on the covered clean energy project's public dashboard or the office's website.Effective November 1, 2027, an owner or operator of a covered clean energy project must submit to the office a grid reliability and security statement. The office must coordinate with the public utilities commission and utilities as appropriate to align permitting readiness with grid reliability needs.On or before December 1, 2027, and on or before each December 1 thereafter, the office must submit a report to certain committees of the general assembly summarizing certain information about the functions of the office.(Note: This summary applies to this bill as introduced.)
Showing 11 to 20 of 25 bills