Issue · Energy

Energy (Utility Regulation)

Every energy bill, vote, and legislator stance in California, automatically classified by Maddy, our AI policy reader.

Total bills
28
2025-2026 Regular Session
Top supporter
Aisha Wahab
100% support rate
Top opponent
Rosilicie Ochoa Bogh
0% support rate
Ranked legislators
10
5 support · 5 oppose
Key legislators

Who's moving utility regulation in California

Legislators moving utility regulation in California
Legislator Party Stance Support rate Votes
Aisha Wahab
Aisha Wahab Senate · District 10
D
Strong +
100% 21
Bob Archuleta
Bob Archuleta Senate · District 30
D
Strong +
100% 16
JA
Jesse Arreguín Senate · District 7
D
Strong +
100% 16
Ben Allen
Ben Allen Senate · District 24
D
Strong +
100% 15
Henry Stern
Henry Stern Senate · District 27
D
Strong +
100% 15
Rosilicie Ochoa Bogh
Rosilicie Ochoa Bogh Senate · District 19
R
Strong −
0% 13
Kelly Seyarto
Kelly Seyarto Senate · District 32
R
Strong −
0% 12
Shannon Grove
Shannon Grove Senate · District 12
R
Strong −
0% 12
David Tangipa
David Tangipa House · District 8
R
Strong −
0% 9
Roger Niello
Roger Niello Senate · District 6
R
Strong −
0% 9
Showing 1–10 of 28 bills

All energy bills

in committee · California · Assembly Mar 9, 2026

AB 2239: Infrastructure-constrained energization areas: energization timelines: environmental review.

Existing law vests the Public Utilities Commission (PUC) with regulatory authority over public utilities, including electrical corporations. Existing law requires the PUC to establish reasonable average and maximum target energization time periods, as defined, and a procedure for customers to report energization delays to the PUC, as provided. Existing law requires the PUC to require an electrical corporation to take remedial actions necessary to achieve the PUC's targets. This bill would require the PUC to require each electrical corporation to meet energization timelines or targets established pursuant to the above-described provisions or by PUC order. The bill would require the PUC to impose a penalty if an electrical corporation fails to meet an energization timeline or target approved or required by the PUC, as provided. This bill would require the PUC to designate an infrastructure-constrained energization area based on objective criteria, including limited distribution or transmission infrastructure relative to available electrical capacity or projected load growth, inland or desert geography, and extended energization timelines. The bill would require the PUC to adopt rules authorizing over-the-fence transactions within infrastructure-constrained energization areas when an electrical corporation cannot reasonably meet energization targets and other specific conditions are met, as specified. The bill would require the PUC, in coordination with the State Energy Resources Conservation and Development Commission (Energy Commission) and local jurisdictions, to establish procedures to facilitate expedited development of electrical generation and energy storage facilities in infrastructure-constrained energization areas, as specified. The bill would require the PUC, in coordination with the Energy Commission, the Office of Land Use and Climate Innovation, and local jurisdictions, to establish procedures to facilitate expedited permitting, siting, and construction of electrical infrastructure owned or operated by an electrical corporation within infrastructure-constrained energization areas, as specified. The bill would require the PUC and the Energy Commission to coordinate with, and advocate before, the Independent System Operator (ISO) for expedited review and prioritization of projects in infrastructure-constrained energization areas, as specified. Existing law establishes the ISO as a nonprofit, public benefit corporation to ensure efficient use and reliable operation of the transmission grid and to manage the transmission grid and related energy markets, as specified. This bill would require the ISO to consider regional economic development needs, infrastructure constraints, and statewide policy objectives when conducting transmission planning and interconnection processes. The bill would require the ISO seek to streamline review and approval processes for projects located within infrastructure-constrained energization areas, as specified, and would require the ISO to annually report to the PUC and the Legislature on transmission and interconnection constraints affecting infrastructure-constrained energization areas. The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of an environmental impact report on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment. This bill would exempt from the requirements of CEQA the approval of an electrical generation or energy storage project located within an infrastructure-constrained energization area if specific conditions are met, as provided. The bill would require the Office of Land Use and Climate Innovation to develop guidelines for the implementation of these provisions. Because a lead agency would be required to determine whether a project would qualify for this exemption, this bill would impose a state-mandated local program. Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the PUC is a crime. Because certain of the above-described provisions would be part of the act and a violation of a PUC action implementing the above-described provisions would be a crime, this bill would impose a state-mandated local program. The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement. This bill would provide that no reimbursement is required by this act for specified reasons.
passed · California · Assembly Aug 13, 2026

AB 2516: California Grid Manufacturing Initiative.

Existing law establishes the Governor's Office of Business and Economic Development (GO-Biz) within the Governor's office and requires GO-Biz to serve the Governor as the lead entity for economic strategy and the marketing of California on issues relating to business development, private sector investment, and economic growth. Existing law creates within GO-Biz the Energy Unit to accelerate the planning, financing, and execution of critical energy infrastructure projects, as specified. This bill would require the Energy Unit, in coordination with other specified state entities, to establish the California Grid Manufacturing Initiative. The bill would require the Energy Unit to determine and provide appropriate forms of state assistance to address identified delays with critical electricity grid components, as defined, to incentivize new or existing in-state manufacturing of critical electricity grid components, and to provide support to joint procurement initiatives. This bill would require the Public Utilities Commission, as soon as practicable, and in consultation with the State Energy Resources Conservation and Development Commission and the Independent System Operator, to develop a process to identify critical electricity grid components and to assess the statewide need for critical electricity grid components for the next 10-year period. The bill would require the assessment to include identification of specific strategies to reduce delays and ratepayer costs associated with the procurement of critical electricity grid components. The bill would require the Public Utilities Commission to determine, for each critical electricity grid component, whether requiring electrical corporations to engage in the joint procurement of the critical electricity grid component would further the purposes of the bill, and if the commission makes that determination, and also determines that electrical corporations would benefit from the joint procurement, the bill would authorize the Public Utilities Commission to require electrical corporations to engage in a joint procurement to fulfill the projected purchasing needs of each participating electrical corporation for the critical electricity grid component, as provided. This bill would require electrical corporations that are required to engaged in a joint procurement pursuant to the bill to, not more than 12 months following the imposition of the requirement, take certain actions, including engaging in a joint cooperative process for the sourcing and negotiation of joint purchase agreements for the purchase of critical electricity grid components. This bill would authorize the Energy Unit to provide assistance to projects that establish or expand manufacturing capacity in California for critical electricity grid components, as specified. The bill would also authorize the Energy Unit to enter into production joint ventures with qualified private suppliers, as provided, and to provide bond financing and other assistance. The bill would authorize the Public Utilities Commission to authorize the recovery of costs incurred under the initiative only to the extent it determines those costs are just and reasonable, cost-effective, and aligned with state energy policy, as provided. To the extent the joint procurement results in costs below prevailing market prices for critical electricity grid components, the bill would require the commission to ensure that the difference is credited to ratepayers, as provided. Under existing law, a violation of an order, decision, rule, direction, demand, or requirement of the commission is a crime. Because a violation of a commission action implementing certain requirements of the bill would be a crime, this bill would impose a state-mandated local program. Existing law, the Bergeson-Peace Infrastructure and Economic Development Bank Act, establishes the California Infrastructure and Economic Development Bank (I-Bank) within GO-Biz and, among other things, authorizes the I-Bank to make loans, issue bonds, and provide financial assistance for various types of projects that qualify as economic development or public development facilities, as provided. This bill would create the California Grid Manufacturing Initiative Revolving Fund in the State Treasury for the purpose of providing financial assistance pursuant to the initiative. The bill would make the moneys in the revolving fund continuously appropriated for expenditure in accordance with the initiative. The bill would authorize the I-Bank, on behalf of the Energy Unit, to issue revenue bonds to finance procurement and manufacturing of critical electricity grid components, and would authorize the I-Bank to provide financial assistance, including financial assistance from the proceeds of the revenue bonds, to a participating party, as defined, in connection with the financing or refinancing of a project to establish or expand manufacturing capacity for critical electricity grid components. The bill would require the I-Bank to meet and confer with the Energy Unit for eligible projects and would provide that final authority to provide financial support to an eligible project resides with the Energy Unit. The bill would require the proceeds of any bonds to be deposited into the revolving fund and used exclusively for the purposes of the initiative. By establishing a continuously appropriated fund, the bill would make an appropriation. The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement. This bill would provide that no reimbursement is required by this act for a specified reason.
Sub-Topics Utility Regulation
passed · California · Assembly Aug 13, 2026

AB 1787: Electrical corporations: rates: smart meter infrastructure: dynamic rate option.

Existing law vests the Public Utilities Commission with regulatory authority over public utilities, including electrical corporations. Existing law authorizes the commission to fix the rates and charges for every public utility and requires that those rates and charges be just and reasonable. Existing law requires each electrical corporation to identify a separate rate component to fund certain programs that enhance system reliability and provide in-state benefits. Existing law requires that the rate component be a nonbypassable element of the local distribution service. This bill would require the commission to require a large electrical corporation, if the commission approves the large electrical corporation's request to upgrade its smart meter infrastructure relative to infrastructure in place on January 1, 2026, to offer eligible customer segments at least one dynamic rate option no later than 18 months after the upgraded smart meter infrastructure is anticipated to be placed into service, as specified. The bill would require the commission to ensure, in reviewing a request of a large electrical corporation to recover costs associated with upgrading its smart meter infrastructure, that specified conditions are met. The bill would also require the commission to ensure, among other things, the large electrical corporation makes the same time-varying distribution rates available to both bundled customers and unbundled customers located in the same geographic area, as specified. Under existing law, a violation of the Public Utilities Act or an order, decision, rule, direction, demand, or requirement of the commission is a crime. Because the above provisions would be part of the act and a violation of a commission action implementing this bill's requirements would be a crime, the bill would impose a state-mandated local program. The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement. This bill would provide that no reimbursement is required by this act for a specified reason.
Sub-Topics Utility Regulation
signed · California · Assembly Jul 16, 2026

AB 2175: Renewable electrical generation facilities: multiple meters: aggregation: logistics businesses and manufacturing businesses.

Existing law vests the Public Utilities Commission with regulatory authority over public utilities, including electrical corporations. Existing law requires each electrical corporation, local publicly owned electric utility, or electrical cooperative, or any other entity that offers electrical service, except as provided, to develop a standard contract or tariff providing for net energy metering, and to make this standard contract or tariff available to eligible customer-generators using renewable electrical generation facilities, as specified. Pursuant to its authority, the commission issued a decision revising net energy metering tariff and subtariffs, commonly known as the net billing tariff. Existing law authorizes an eligible customer-generator with multiple meters to aggregate the electrical load of the meters located on the property where the renewable electrical generation facility is located and on all property adjacent or contiguous to the property on which the renewable electrical generation facility is located, if those properties are solely owned, leased, or rented by the eligible customer-generator, as provided. This bill would require the commission, for purposes of certain net energy metering contracts or tariffs, to ensure that logistics businesses and manufacturing businesses are eligible customer-generators for purposes of aggregating multiple meters, as described above, if the commission extends the application of that provision. Under existing law, a violation of any order, decision, rule, direction, demand, or requirement of the commission is a crime. Because a violation of a commission action implementing this bill's requirements would be a crime, the bill would impose a state-mandated local program. The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement. This bill would provide that no reimbursement is required by this act for a specified reason.
in committee · California · Assembly Apr 13, 2026

AB 2611: Electrical rates: credits: hot climate zones.

Existing law vests the Public Utilities Commission (PUC) with regulatory authority over public utilities, including electrical corporations, while local publicly owned electric utilities are under the direction of their governing boards. The California Global Warming Solutions Act of 2006 requires the State Air Resources Board to adopt regulations for greenhouse gas emissions limits and emissions reduction measures to achieve the maximum technologically feasible and cost-effective reductions in greenhouse gas emissions in furtherance of achieving the statewide greenhouse gas emissions limit, as defined. The act authorizes the state board to revise regulations or adopt additional regulations to further the act. The act authorizes that state board to include in those regulations the use of a market-based compliance mechanism to comply with those regulations. Existing law requires the PUC to require revenues received by an electrical corporation as a result of the direct allocation of greenhouse gas allowances to electrical corporations pursuant to the regulations that implement the market-based compliance mechanism to be credited directly to the residential customers of the electrical corporation, as provided. This bill would require the PUC to determine, and to require an electrical corporation to provide, an additional credit to the residential customers of the electrical corporation in hot climate zones, including, but not limited to, specified building climate zones as determined by the State Energy Resources Conservation and Development Commission (Energy Commission) , as provided. The bill would require the PUC to calculate the credit with the intent to mitigate the impact of tiered rates during extremely hot days, as defined. Existing law requires a local publicly owned electric utility that receives a direct allocation of greenhouse gas allowances in addition to the greenhouse gas allowance totals specified in the regulations that implement the market-based compliance mechanism to provide a credit, as provided. This bill would require the PUC to determine, and a local publicly owned electric utility to provide, an additional credit to ratepayers in hot climate zones, including, but not limited to, specified building climate zones as determined by the Energy Commission, as provided. By imposing additional duties on a local publicly owned electric utility, the bill would impose a state-mandated local program. The bill would require the PUC to calculate the credit with the intent to mitigate the impact of tiered rates during extremely hot days, as defined. Under existing law, a violation of any order, decision, rule, direction, demand, or requirement of the commission is a crime. Because a violation of a commission action implementing this bill's requirements would be a crime, the bill would impose a state-mandated local program. The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement. This bill would provide that with regard to certain mandates no reimbursement is required by this act for a specified reason. With regard to any other mandates, this bill would provide that, if the Commission on State Mandates determines that the bill contains costs so mandated by the state, reimbursement for those costs shall be made pursuant to the statutory provisions noted above.
Sub-Topics Utility Regulation
in committee · California · Assembly May 14, 2026

AB 1774: Electrical corporations: wildfire mitigation plans: expenditures.

Existing law requires an electrical corporation to submit to the Office of Energy Infrastructure Safety a wildfire mitigation plan at least once every 4 years for review. Existing law requires the office to approve or deny each wildfire mitigation plan within 9 months of its submission. Existing law requires the Public Utilities Commission to assess a penalty on an electrical corporation that fails to substantially comply with its wildfire mitigation plan. Existing law prohibits a large electrical corporation from including in its equity rate base its share for the first $5,000,000,000 expended in aggregate by large electrical corporations on fire risk mitigation capital expenditure, as provided, and authorizes those expenditures to be financed through a financing order, as described. Existing law requires the commission, in addition to the $5,000,000,000, to prohibit a large electrical corporation from including in its equity rate base its share of the first $6,000,000,000 expended in aggregate by large electrical corporations on fire risk mitigation capital expenditures approved by the commission on or after January 1, 2026, and authorizes the electrical corporation's share of the fire risk mitigation capital expenditures and the debt financing cost of these fire risk mitigation capital expenditures to be financed through a financing order, as provided. This bill would require the commission, on or before June 30, 2027, to complete a one-time independent audit of all wildfire mitigation expenditures incurred by each electrical corporation between January 1, 2021, and January 1, 2027, as provided. The bill would require that the audit be conducted by an independent third-party auditor. The bill would require the commission, in the next appropriate proceeding following the audit, to consider the findings of the audit in determining the terms and conditions under which an electrical corporation's requested cost recovery may be authorized, as provided. The bill would require the commission to establish a schedule for conducting future independent audits of each electrical corporation's wildfire mitigation expenditures incurred during the preceding 4 calendar years. The bill would require the commission, pursuant to that schedule, to conduct an independent audit of an electrical corporation's prior wildfire mitigation expenditures before any proceeding in which the electrical corporation seeks to recover, collect, or expend ratepayer funds for wildfire mitigation programs, including, but not limited to, expenditures authorized pursuant to an approved wildfire mitigation plan. Under existing law, a violation of an order, decision, rule, direction, demand, or requirement of the commission is a crime. Because a violation of a commission action implementing the bill's requirements would be a crime, this bill would impose a state-mandated local program. The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement. This bill would provide that no reimbursement is required by this act for a specified reason.
Sub-Topics Utility Regulation
in committee · California · Assembly May 14, 2026

AB 2508: Public Utilities Public Purpose Programs Fund.

Existing law vests the Public Utilities Commission with regulatory authority over public utilities, including electrical corporations. Under existing law, the commission administers, or otherwise oversees, various public purpose programs, including energy efficiency and conservation programs, cost-effective energy efficiency programs, rate assistance programs for eligible food banks, and home insulation financial assistance programs. Under existing law, those programs are generally funded through a charge on electrical service, which is collected through customer rates. This bill would establish the Public Utilities Public Purpose Programs Fund. The bill would require the commission, no later than January 1 of each year, commencing January 1, 2027, to determine and publish the amount necessary to fund certain public purpose programs and programs administered by electrical regional energy networks for the following fiscal year, as provided. The bill would require the Controller to transfer, on July 1 of each fiscal year, from the Greenhouse Gas Reduction Fund to the Public Utilities Public Purpose Programs Fund moneys appropriated by the Legislature for that purpose. The bill would require all moneys in the Public Utilities Public Purpose Programs Fund to be allocated by the commission, upon appropriation by the Legislature, to fund the public purpose programs and programs administered by electrical regional energy networks, as provided. The bill would repeal various charges on electrical service that fund public purpose programs and, instead, provide mechanisms for funding those public purpose programs through the Public Utilities Public Purpose Programs Fund, as specified. Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime. Because certain of the above provisions would be part of the act and a violation of a commission action implementing this bill's requirements would be a crime, the bill would impose a state-mandated local program. The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement. This bill would provide that no reimbursement is required by this act for a specified reason.
in committee · California · Assembly May 14, 2026

AB 2396: Community choice aggregators: eligible transmission projects.

Existing law authorizes a community choice aggregator to aggregate the electrical load of interested electricity consumers within its boundaries and requires a community choice aggregator to file an implementation plan with the Public Utilities Commission, to register with the commission, and to enter into an operating service agreement with an electrical corporation. Existing law requires the Energy Unit within the Governor's Office of Business and Economic Development to establish a Transmission Infrastructure Accelerator (accelerator) to develop a financing and development strategy for eligible transmission projects, as defined, to receive California Transmission Accelerator financing, and requires the accelerator to take the necessary steps to accelerate the development and deployment of those projects to maximize ratepayer savings. This bill would authorize a community choice aggregator to sponsor, develop, finance, construct, operate, lease, purchase, and own an eligible transmission project, regardless of whether the electrical transmission lines are used for the purpose of conveying electricity to the customers of the community choice aggregator. Under existing law, a violation of an order, decision, rule, direction, demand, or requirement of the commission is a crime. Because a violation of a commission action implementing the provisions of this bill would be a crime, the bill would impose a state-mandated local program. The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement. This bill would provide that no reimbursement is required by this act for a specified reason.
in committee · California · Assembly May 14, 2026

AB 2088: Public Utilities: thermal energy networks.

Existing law vests the Public Utilities Commission (PUC) with regulatory authority over public utilities, including gas corporations and heat corporations. Existing law requires every public utility to furnish and maintain adequate, efficient, just, and reasonable service, instrumentalities, equipment, and facilities, as are necessary to promote the safety, health, comfort, and convenience of its customers, its employees, and the public. Existing law authorizes a gas corporation to cease providing service if a certain pilot program has been implemented and the PUC determines that adequate substitute energy service is reasonably available for the energy end uses of affected gas corporation customers. This bill would authorize a utility regulated by the PUC to own and operate thermal energy service through thermal energy networks, as defined, and would require the PUC to ensure that the substitution of thermal energy service for gas service offers an adequate substitute for the thermal end-use energy needs of customers, as provided. The bill would prohibit a utility regulated by the PUC from recovering costs for gas infrastructure in areas approved to be served by a thermal energy network, except as specified. The bill would require the commission and gas corporations to prioritize the use of the existing gas utility workforce for the transition to thermal energy network operations, as specified. The bill would require a utility to ensure that all contractors and subcontractors performing work on a thermal energy network project use a skilled and trained workforce. The bill would require the PUC, on or before December 31, 2027, to initiate a proceeding to establish a regulatory framework for the provision of cost-effective thermal energy service by gas corporations or other public utilities, as provided. This bill would require the State Energy Resources Conservation and Development Commission (Energy Commission) , in consultation with the PUC, on or before December 31, 2027, to develop technical standards for thermal energy networks, as provided. The bill would require the Energy Commission to complete the development of the technical standards before the PUC initiates the proceeding described above. Under existing law, a violation of the Public Utilities Act or an order, decision, rule, direction, demand, or requirement of the PUC is a crime. Because the labor requirements for a thermal energy network project would be part of the act and a violation of a PUC action implementing those requirements would be a crime, this bill would impose a state-mandated local program. The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement. This bill would provide that no reimbursement is required by this act for a specified reason.
Sub-Topics Utility Regulation
passed both · California · Assembly Aug 26, 2026

AB 2505: Electrical corporations: hydrogen refueling stations.

Existing law vests the Public Utilities Commission with regulatory authority over public utilities, including electrical corporations. Existing law authorizes the commission to fix the rates and charges for every public utility and requires that those rates and charges be just and reasonable. Existing law requires each electrical corporation to file an advice letter for, and requires the commission to approve, a new tariff or rule that authorizes each electrical corporation to design and deploy all electrical distribution infrastructure on the utility side of the customer's meter for all customers installing separately metered infrastructure to support electric vehicle charging stations, other than those in single-family residences. This bill would require each electrical corporation, on or before April 1, 2027, to file an advice letter for, and require the commission, on or before September 1, 2027, to approve, a new or modified tariff or rule that authorizes the electrical corporation to design, construct, own, operate, and maintain all electrical distribution and service facilities located on the utility side of a customer's meter that are necessary to provide separately metered electrical service to hydrogen refueling stations, including hydrogen refueling stations located on premises that already receive electrical service for other uses. The bill would require that the tariff or rule authorize an electrical corporation to extend utility-side electrical distribution and service facilities from the existing distribution system to a dedicated revenue meter serving a heavy-duty hydrogen refueling station that serves vehicles that are 14,001 pounds or greater and authorize the installation of a dedicated revenue meter for the hydrogen refueling station load, as provided. The bill would require a facility installed pursuant to the tariff or rule to be treated, for cost allocation and customer contribution purposes, as line and service extensions, as provided. The bill would require that the tariff or rule require the electrical corporation to provide the applicant a good faith estimate before the applicant is required to execute a line or service extension agreement or make a nonrefundable payment, as provided. The bill would repeal its provisions on January 1, 2033. Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime. Because the provisions of the bill would be a part of the act and a violation of a commission action implementing the bill's requirements would be a crime, this bill would impose a state-mandated local program. The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement. This bill would provide that no reimbursement is required by this act for a specified reason.
Showing 1 to 10 of 28 bills
1 2 3 Next