Existing law vests the Public Utilities Commission with regulatory authority over public utilities, including gas corporations. Existing law authorizes the commission to fix the rates and charges for every public utility and requires that those rates and charges be just and reasonable. Existing law requires, until at least December 31, 2029, each gas corporation to submit to the commission a map that includes, among other things, the location of all potential gas distribution line replacement projects identified in its distribution integrity management plan and any foreseeable gas distribution pipeline replacements, as provided. This bill would require each gas corporation to submit an annual report to the commission that describes its expenditures associated with gas distribution infrastructure replacement and upgrade projects, as provided. The bill would require the commission, as part of its long-term gas planning rulemaking or a successor proceeding, to consider a framework for the depreciation of gas distribution infrastructure that reflects reasonably foreseeable changes in gas demand and is designed to minimize future ratepayer exposure to stranded asset costs, and would authorize the commission to apply the framework in evaluating the depreciation of, and cost recovery for, gas distribution infrastructure replacements and upgrades. Under existing law, a violation of the Public Utilities Act or an order, decision, rule, direction, demand, or requirement of the commission is a crime. Because the above provisions would be part of the Public Utilities Act and a violation of a commission action implementing this bill's requirements would be a crime, the bill would impose a state-mandated local program. The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement. This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law vests the Public Utilities Commission (PUC) with regulatory authority over public utilities, including electrical corporations. Existing law requires the PUC, on or before March 31, 2024, to evaluate each customer renewable energy subscription program to determine if the program meets specified goals and to determine whether it would be beneficial to ratepayers to establish a new tariff or program for an electrical corporation, or modify an existing tariff or program administered by an electrical corporation, to establish a community renewable energy program, as provided. If the PUC determines that it would be beneficial to ratepayers to establish the community renewable energy program, existing law requires the PUC, on or before July 1, 2024, to establish the program and require each electrical corporation to participate in the program. This bill would revise the requirements of the customer renewable energy subscription program, as provided, among other things, to promote participation by low-income customers at levels commensurate with the opportunity provided to certain customer-generators, to provide bill credits to subscribers based on the avoided costs of community renewable energy generators, as defined, participating in the program if the community renewable energy generator is determined to be a load-modifying resource, to require all community renewable energy generators participating in the program to have no more than 5 megawatts of generation capacity and no more than 5 megawatts of energy storage, and to limit the total program capacity to 4 gigawatts or end the enrollment of new community renewable energy generators in the program after 7 years, whichever occurs first. The bill would require the State Energy Resources Conservation and Development Commission (Energy Commission) , in a public process that includes opportunity for public comment, to evaluate the load-modifying potential of community renewable energy generators, as specified, and, if the evaluation finds that community renewable energy generators have load-modifying potential, to, on or before December 1, 2027, in a public process with opportunity for public comment, identify attributes that the Energy Commission would expect a community renewable energy generator to meet in order to be classified by the PUC as a load-modifying resource, as provided. The bill would require the PUC, within 180 days following the identification of attributes by the Energy Commission, to adopt or modify a customer renewable energy subscription program consistent with the revisions to the program made by the bill, and would require the PUC to establish in the program a mechanism to determine whether community renewable energy generators are load-modifying resources, as provided. Existing law requires the PUC, within 24 months of establishing a community renewable energy program and annually thereafter for the duration of the program, to submit to the Legislature a report on the facilities deployed and customers subscribed, as provided. This bill would instead require the PUC, within 24 months of the adoption or modification of a customer renewable energy subscription program and annually thereafter for the duration of the program, to submit to the Legislature a report on the community renewable energy generators participating in the program and customers subscribed. The bill would repeal this requirement on January 1, 2034. Under existing law, a violation of an order, decision, rule, direction, demand, or requirement of the PUC is a crime. Because a violation of a PUC action implementing this bill's requirements would be a crime, the bill would impose a state-mandated local program. The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement. This bill would provide that no reimbursement is required by this act for a specified reason.
(1) Existing law establishes the State Energy Resources Conservation and Development Commission and prescribes the authorities, duties, and responsibilities of the commission pertaining to energy matters. Existing law requires the commission, on or before January 1, 2019, in consultation with the Contractors State License Board, local building officials, and other stakeholders, to approve a plan that promotes compliance with specified regulations relating to building energy efficiency standards in the installation of central air-conditioning and heat pumps, as specified. Existing law authorizes the commission to adopt regulations to increase compliance with permitting and inspection requirements for central air-conditioning and heat pumps, and associated sales and installations, consistent with the above-described plan. This bill would establish various requirements and authorizations for the installation of a residential heat pump water heater or heat pump HVAC system, as defined, by, among other things, requiring a city, county, or city and county, beginning July 1, 2027, to adopt and offer asynchronous inspections for installations that do not require a licensed contractor and building inspector to be simultaneously present during the inspection. The bill would additionally require a city, county, or city and county, except as specified, to post specific information online, and on or before July 1, 2028, to implement an online automated permitting process for the installation of a residential heat pump water heater or heat pump HVAC system that issues permits in real time to a licensed contractor that meets certain criteria. The bill would require the criteria to include, among others, that the licensed contractor certify under penalty of perjury that they have performed a load calculation to properly size the new equipment, as specified. By expanding the crime of perjury, the bill would impose a state-mandated local program. By imposing these various new duties on the described local entities, the bill would impose a state-mandated local program. The bill would authorize a city, county, or city and county, except as specified, to require up to one nondiscretionary permit per installation of a residential heat pump water heater or heat pump HVAC system in which the local entity administratively approves an application to install the residential heat pump water heater or heat pump HVAC system. The bill would additionally authorize a city, county, or city and county to apply only certain planning or zoning or workforce labor standards on the installation of a residential heat pump water heater or heat pump HVAC system that are in addition to any state-level requirements. The bill would prohibit a local entity described above from requiring a permit or inspection for plug-in ready window air-conditioner or window heat pump HVAC systems, provided that certain requirements are met, including that the appliance has a voltage rating of 120 volts or less and the appliance is a self-contained unit. The bill would limit the amount a city, county, or city and county may charge as a permit fee for a residential heat pump water heater or heat pump HVAC system, as specified. The bill would require a local entity described above that applies to receive any funding from the commission to self-certify to the commission its compliance with any applicable portions of the bill's provisions. The above provisions would not apply to new residential construction. The bill would include findings and declarations related to these provisions. (2) Existing law, the Davis-Stirling Common Interest Development Act, defines and regulates common interest developments. Among other things, the act makes a provision of the governing document or architectural or landscaping guidelines or policies void and unenforceable if, among other things, the provision prohibits, or includes conditions that have the effect of prohibiting, the use of low water-using plants as a group or as a replacement of existing turf. This bill would additionally make any provision of the governing documents, architectural guidelines, or policies void and unenforceable if the provision prevents the replacement of a fuel-gas-burning appliance with an electric appliance. The bill would also make any covenant, restriction, or condition contained in any, among other specified agreements, deed, and any provision of a governing document, that effectively prohibits or restricts the installation or use of a residential heat pump water heater or heat pump HVAC system, void and unenforceable. The bill would prohibit an association, among other things, from prohibiting or restricting a member from installing, upgrading, replacing, or using a residential heat pump water heater or heat pump HVAC system in the member's separate interest, except as specified. (3) The bill would include findings that changes proposed by this bill address a matter of statewide concern rather than a municipal affair and, therefore, apply to all cities, including charter cities. (4) The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement. This bill would provide that, with regard to certain mandates, no reimbursement is required by this act for a specified reason. With regard to any other mandates, this bill would provide that, if the Commission on State Mandates determines that the bill contains costs so mandated by the state, reimbursement for those costs shall be made pursuant to the statutory provisions noted above.
Existing law requires a city, county, or city and county to administratively approve an application to install an electric vehicle charging station through the issuance of a building permit or similar nondiscretionary permit, and requires every local government to adopt an ordinance that creates an expedited, streamlined permitting process for electric vehicle charging stations, as provided. Existing law defines "electric vehicle charging station" to mean any level of electric vehicle supply equipment station that is designed and built in compliance with specified provisions, and delivers electricity from a source outside an electric vehicle into a plug-in electric vehicle. Existing law requires fees charged by a local agency for specified purposes, including permits, to not exceed the estimated reasonable cost of providing the service for which the fee is charged, unless a question regarding the amount of the fee charged in excess of this cost is submitted to, and approved by, 23 of the electors. Existing law, until January 1, 2034, prohibits a city, county, city or county, or charter city from charging a permit fee for a solar energy system that exceeds the estimated reasonable cost of providing the service for which the fee is charged, which cannot exceed $450 plus $15 per kilowatt for each kilowatt above 15kW for residential solar energy systems, and $1,000 plus $7 per kilowatt for each kilowatt between 51kW and 250kW, plus $5 for every kilowatt above 250kW, for commercial solar energy systems, unless the city, county, city and county, or charter city provides substantial evidence of the reasonable cost to issue the permit as part of a written finding and an adopted resolution or ordinance, as provided. This bill, until January 1, 2036, would prohibit a city, county, city or county, or charter city from charging a permit fee for an electric vehicle charging station that exceeds the estimated reasonable cost of providing the service for which the fee is charged, which cannot exceed $500 plus $5 per kilowatt for each kilowatt between 51kW and 250kW, plus $2 for every kilowatt above 250kW, for a level 2 electric vehicle charging station installed at a new or existing multifamily housing development, unless the city, county, city and county, or charter city provides substantial evidence of the reasonable cost to issue the permit as part of a written finding and an adopted resolution or ordinance, as provided. The bill would make its provisions operative on July 1, 2027, but for every city, county, city and county, or charter city with a population of fewer than 200,000 residents, the provisions would apply beginning on January 1, 2028. By requiring local agencies to perform additional duties, the bill would impose a state-mandated local program. This bill would make related findings and declarations. The bill would include findings that changes proposed by this bill address a matter of statewide concern rather than a municipal affair and, therefore, apply to all cities, including charter cities. The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement. This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law authorizes the Public Utilities Commission to fix the rates and charges for public utilities, including electrical corporations and gas corporations, and requires those rates and charges to be just and reasonable. Under existing law, a regulated public utility is prohibited from using ratepayer funds for advocacy-related activities that are political or do not otherwise benefit ratepayers. Existing law prohibits each electrical corporation or gas corporation from recording to an above-the-line account, or otherwise recovering from ratepayers, direct or indirect costs of specified activities. This bill would include in those activities for which costs may not be recovered from ratepayers any activities related to opposing the municipalization of electrical or gas utility service, as specified. Existing law authorizes the commission, each commissioner, and each officer and person employed by the commission to inspect the accounts, books, papers, and documents of any public utility. Existing law establishes within the commission an independent Public Advocate's Office of the Public Utilities Commission and authorizes the office to require an entity regulated by the commission to produce or disclose any information the office deems necessary to perform its duties, as provided. This bill would additionally authorize the office to require an entity regulated by the commission to produce or disclose any information the office deems necessary to support the commission's duties. The bill would also specify that the office has the same authority to discover information and review the accounts of a public utility as the commission and would change the timing of a specified annual report by the office to the Legislature. Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime. Because the above-described provisions would be part of the act and a violation of a commission action implementing the bill's requirements would be a crime, this bill would impose a state-mandated local program. The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement. This bill would provide that no reimbursement is required by this act for a specified reason.
The California Land Conservation Act of 1965 (act) , otherwise known as the Williamson Act, authorizes a city or county to contract with a landowner to limit the use of agricultural land to agricultural use if the land is located in an agricultural preserve designated by the city or county, as specified. Existing law authorizes the county or city to cancel a contract under certain circumstances and conditions. Existing law requires the city or county to determine the amount of the cancellation fee, based on the assessor's determination of the fair market value of the land as though it were free of the contractual restriction, that the landowner shall pay if the city and county approves a cancellation of a contract, as specified. Existing law authorizes the city or county to waive the payment or extend the time for making payment if the cancellation is caused by an involuntary transfer or change in the use which may be made of land, the county or city has determined that it is in the best interest of the program to conserve agricultural land use that the payment be either deferred or not required, and the extension is approved by the Secretary of the Natural Resources Agency, as provided. This bill would remove the ability of a city or county to waive payment or extend the time for making payment, as described above. The bill would instead authorize the Secretary of the Natural Resources Agency, upon application by the landowner, to waive payment or extend the time for making payment, as described above, if either the cancellation is caused by an involuntary transfer or change in the use which may be made of the land, as described above, or the cancellation is to facilitate a photovoltaic solar facility that meets specified conditions. The bill, until January 1, 2037, would require the secretary to approve a completed application for extension of making the payment by a landowner if it includes certain items, as provided, and would require the secretary to waive payment if the landowner attests and provides proof to the secretary that a solar project has been constructed on the property. The act deems a contract null and void upon acquisition of the land subject to the contract in an eminent domain action or upon acquisition of land in lieu of eminent domain, as provided. The Jobs and Economic Improvement Through Environmental Leadership Act of 2021 authorizes the Governor, until January 1, 2032, to certify, among other projects, a clean renewable energy project that generates electricity exclusively through wind or solar, as specified, for certain streamlining benefits. This bill would additionally deem a contract null and void when that land is approved for use as a photovoltaic solar facility certified under the Jobs and Economic Improvement Through Environmental Leadership Act of 2021, as provided.
The Powering Up Californians Act requires the Public Utilities Commission to determine the criteria for timely service for electrical customers to be energized, including, among other things, categories of timely electric service through energization, as specified. The act requires the commission to establish reasonable average and maximum target energization time periods to ensure that work is completed in a manner that minimizes delay in meeting the date requested by an electrical customer to the greatest extent possible. This bill would require the commission, by September 30, 2027, in a new or existing proceeding, to establish timelines for electrical corporations to respond to and process requests to energize small energization projects, as provided. The bill would require the commission, in establishing the timelines for energization, to require electrical corporations to comply with certain requirements. Under existing law, a violation of an order, decision, rule, direction, demand, or requirement of the commission is a crime. Because the above-described provisions would be part of the act and a violation of a commission action implementing the bill's requirements would be a crime, this bill would impose a state-mandated local program. The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement. This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law establishes the Governor's Office of Business and Economic Development (GO-Biz) within the Governor's office and requires GO-Biz to serve the Governor as the lead entity for economic strategy and the marketing of California on issues relating to business development, private sector investment, and economic growth. Existing law creates within GO-Biz the Energy Unit to accelerate the planning, financing, and execution of critical energy infrastructure projects, as specified. This bill would require the Energy Unit, in coordination with other specified state entities, to establish the California Grid Manufacturing Initiative. The bill would require the Energy Unit to determine and provide appropriate forms of state assistance to address identified delays with critical electricity grid components, as defined, to incentivize new or existing in-state manufacturing of critical electricity grid components, and to provide support to joint procurement initiatives. This bill would require the Public Utilities Commission, as soon as practicable, and in consultation with the State Energy Resources Conservation and Development Commission and the Independent System Operator, to develop a process to identify critical electricity grid components and to assess the statewide need for critical electricity grid components for the next 10-year period. The bill would require the assessment to include identification of specific strategies to reduce delays and ratepayer costs associated with the procurement of critical electricity grid components. The bill would require the Public Utilities Commission to determine, for each critical electricity grid component, whether requiring electrical corporations to engage in the joint procurement of the critical electricity grid component would further the purposes of the bill, and if the commission makes that determination, and also determines that electrical corporations would benefit from the joint procurement, the bill would authorize the Public Utilities Commission to require electrical corporations to engage in a joint procurement to fulfill the projected purchasing needs of each participating electrical corporation for the critical electricity grid component, as provided. This bill would require electrical corporations that are required to engaged in a joint procurement pursuant to the bill to, not more than 12 months following the imposition of the requirement, take certain actions, including engaging in a joint cooperative process for the sourcing and negotiation of joint purchase agreements for the purchase of critical electricity grid components. This bill would authorize the Energy Unit to provide assistance to projects that establish or expand manufacturing capacity in California for critical electricity grid components, as specified. The bill would also authorize the Energy Unit to enter into production joint ventures with qualified private suppliers, as provided, and to provide bond financing and other assistance. The bill would authorize the Public Utilities Commission to authorize the recovery of costs incurred under the initiative only to the extent it determines those costs are just and reasonable, cost-effective, and aligned with state energy policy, as provided. To the extent the joint procurement results in costs below prevailing market prices for critical electricity grid components, the bill would require the commission to ensure that the difference is credited to ratepayers, as provided. Under existing law, a violation of an order, decision, rule, direction, demand, or requirement of the commission is a crime. Because a violation of a commission action implementing certain requirements of the bill would be a crime, this bill would impose a state-mandated local program. Existing law, the Bergeson-Peace Infrastructure and Economic Development Bank Act, establishes the California Infrastructure and Economic Development Bank (I-Bank) within GO-Biz and, among other things, authorizes the I-Bank to make loans, issue bonds, and provide financial assistance for various types of projects that qualify as economic development or public development facilities, as provided. This bill would create the California Grid Manufacturing Initiative Revolving Fund in the State Treasury for the purpose of providing financial assistance pursuant to the initiative. The bill would make the moneys in the revolving fund continuously appropriated for expenditure in accordance with the initiative. The bill would authorize the I-Bank, on behalf of the Energy Unit, to issue revenue bonds to finance procurement and manufacturing of critical electricity grid components, and would authorize the I-Bank to provide financial assistance, including financial assistance from the proceeds of the revenue bonds, to a participating party, as defined, in connection with the financing or refinancing of a project to establish or expand manufacturing capacity for critical electricity grid components. The bill would require the I-Bank to meet and confer with the Energy Unit for eligible projects and would provide that final authority to provide financial support to an eligible project resides with the Energy Unit. The bill would require the proceeds of any bonds to be deposited into the revolving fund and used exclusively for the purposes of the initiative. By establishing a continuously appropriated fund, the bill would make an appropriation. The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement. This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law requires the Public Utilities Commission to determine appropriate targets, if any, for each load-serving entity, as defined, to procure viable and cost-effective energy storage systems to be achieved by December 31, 2020. Existing law requires the commission to direct the state's 3 largest electrical corporations to file applications for programs and investments to accelerate widespread deployment of distributed energy storage systems. This bill would require an electrical corporation, as part of the distribution planning process, to evaluate whether distributed energy storage systems can meet the identified reliability or capacity need, as provided. The bill would require an electrical corporation, if it determines that a third-party alternative may be feasible, to conduct a competitive solicitation or other transparent process to evaluate third-party solutions. Under existing law, a violation of the Public Utilities Act or of any order, decision, rule, direction, demand, or requirement of the commission is a crime. Because the provisions of this bill would be part of the act, and a violation of a commission action implementing the bill's requirements would be a crime, this bill would impose a state-mandated local program. The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement. This bill would provide that no reimbursement is required by this act for a specified reason.
The California Constitution generally limits the maximum rate of ad valorem tax on real property to 1% of the full cash value of the property and defines "full cash value" for these purposes as the appraised value of real property when purchased, newly constructed, or a change in ownership has occurred after the 1975 assessment. Pursuant to constitutional authorization, existing property tax law excludes from the definition of "newly constructed" for these purposes the construction or addition of any active solar energy system, as defined, through the 2025–26 fiscal year, except as specified. This bill would prescribe rules for the valuation of an active solar energy system under certain valuation methods, including a requirement that, under the income method, the assessor exclude from income the benefit from, among other things, renewable energy credits, as defined. By expanding the duties of local tax officials, this bill would impose a state-mandated local program. Existing law requires the state to reimburse local agencies annually for certain property tax revenues lost as a result of any exemption or classification of property for purposes of ad valorem property taxation. This bill would provide that, notwithstanding those provisions, no appropriation is made and the state shall not reimburse local agencies for property tax revenues lost by them pursuant to the bill. The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement. This bill would provide that, if the Commission on State Mandates determines that the bill contains costs mandated by the state, reimbursement for those costs shall be made pursuant to the statutory provisions noted above. This bill would take effect immediately as a tax levy. This bill would include a change in state statute that would result in a taxpayer paying a higher tax within the meaning of Section 3 of Article XIIIA of the California Constitution, and thus would require for passage the approval of 23 of the membership of each house of the Legislature.