AB 1813 California Assembly · 2025-2026 Regular Session

Electricity: customer renewable energy subscription program.

Summary
Existing law vests the Public Utilities Commission (PUC) with regulatory authority over public utilities, including electrical corporations. Existing law requires the PUC, on or before March 31, 2024, to evaluate each customer renewable energy subscription program to determine if the program meets specified goals and to determine whether it would be beneficial to ratepayers to establish a new tariff or program for an electrical corporation, or modify an existing tariff or program administered by an electrical corporation, to establish a community renewable energy program, as provided. If the PUC determines that it would be beneficial to ratepayers to establish the community renewable energy program, existing law requires the PUC, on or before July 1, 2024, to establish the program and require each electrical corporation to participate in the program. This bill would revise the requirements of the customer renewable energy subscription program, as provided, among other things, to promote participation by low-income customers at levels commensurate with the opportunity provided to certain customer-generators, to provide bill credits to subscribers based on the avoided costs of community renewable energy generators, as defined, participating in the program if the community renewable energy generator is determined to be a load-modifying resource, to require all community renewable energy generators participating in the program to have no more than 5 megawatts of generation capacity and no more than 5 megawatts of energy storage, and to limit the total program capacity to 4 gigawatts or end the enrollment of new community renewable energy generators in the program after 7 years, whichever occurs first. The bill would require the State Energy Resources Conservation and Development Commission (Energy Commission) , in a public process that includes opportunity for public comment, to evaluate the load-modifying potential of community renewable energy generators, as specified, and, if the evaluation finds that community renewable energy generators have load-modifying potential, to, on or before December 1, 2027, in a public process with opportunity for public comment, identify attributes that the Energy Commission would expect a community renewable energy generator to meet in order to be classified by the PUC as a load-modifying resource, as provided. The bill would require the PUC, within 180 days following the identification of attributes by the Energy Commission, to adopt or modify a customer renewable energy subscription program consistent with the revisions to the program made by the bill, and would require the PUC to establish in the program a mechanism to determine whether community renewable energy generators are load-modifying resources, as provided. Existing law requires the PUC, within 24 months of establishing a community renewable energy program and annually thereafter for the duration of the program, to submit to the Legislature a report on the facilities deployed and customers subscribed, as provided. This bill would instead require the PUC, within 24 months of the adoption or modification of a customer renewable energy subscription program and annually thereafter for the duration of the program, to submit to the Legislature a report on the community renewable energy generators participating in the program and customers subscribed. The bill would repeal this requirement on January 1, 2034. Under existing law, a violation of an order, decision, rule, direction, demand, or requirement of the PUC is a crime. Because a violation of a PUC action implementing this bill's requirements would be a crime, the bill would impose a state-mandated local program. The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement. This bill would provide that no reimbursement is required by this act for a specified reason.
Bill status passed both 4 of 5 stages cleared
Introduction
Feb 2026
Committee Review
Aug 2026
Assembly Passage
May 2026
Senate Passage
Aug 2026
Governor
Introduced Feb 10, 2026 Last action Aug 30, 2026
Maddy AI version diff · 5 comparisons

What changed between versions

08/27/26 - Amended Senate AB1813 · 3 edits
MINOR
This diff reflects a change in document presentation format rather than a change in legislative content. The bill text of AB 1813 (Electricity: customer renewable energy subscription program) remains substantively identical between the two versions. The old version used official legislative print formatting with page numbers and line numbers, while the new version is a web-based presentation that adds navigation elements and removes print artifacts.
TECHNICAL

Document reformatted from official legislative print format (with page numbers, line numbers, and column layout) to a web-based presentation format with navigation menus, search tools, and simplified text layout.

Web interface elements added including navigation links (home, accessibility, FAQ, feedback, sitemap, login), bill search functionality, version selector dropdown, and share/track options.

Legislative print formatting artifacts removed including page numbers (e.g., '95', '-2-'), line numbers, and column layout markers.

Floor votes · Senate Aug 30, 2026 · Assembly May 22, 2026

How they voted

3010
Passed
Total votes 40
Aug 30, 2026
D Democratic30
30 Yea
100% Yea
R Republican10
10 Nay
100% Nay
Vote distribution
All Yea All Nay Mixed No data
Full legislative history

Actions timeline

Total actions
24
Key actions
9
Committee
10
Amendments
7
Aug 30, 2026
Introduced
In Assembly. Concurrence in Senate amendments pending.
lower
Aug 30, 2026
Upper · Passed
Read third time. Passed. Ordered to the Assembly. (Ayes 30. Noes 10.).
upper
Aug 27, 2026
Upper · Passed
Read third time and amended. Ordered to second reading.
upper
Aug 13, 2026
Upper · Passed
From committee: Do pass. (Ayes 5. Noes 2.) (August 13).
upper
Jun 29, 2026
Committee
In committee: Referred to APPR. suspense file.
upper
Jun 18, 2026
Upper · Passed
Read second time and amended. Re-referred to Com. on APPR.
upper
Jun 17, 2026
Introduced
From committee: Amend, and do pass as amended and re-refer to Com. on APPR. (Ayes 11. Noes 2.) (June 16).
upper
Jun 3, 2026
Committee
Referred to Com. on E., U & C.
upper
May 22, 2026
Lower · Passed
Read third time. Passed. Ordered to the Senate. (Ayes 51. Noes 8. Page 5258.)
lower
May 14, 2026
Lower · Passed
From committee: Do pass. (Ayes 10. Noes 2.) (May 14).
lower
May 6, 2026
Committee
In committee: Set, first hearing. Referred to APPR. suspense file.
lower
Apr 28, 2026
Committee
Re-referred to Com. on APPR.
lower
Apr 27, 2026
Lower · Passed
Read second time and amended.
lower
Apr 23, 2026
Introduced
From committee: Amend, and do pass as amended and re-refer to Com. on APPR. (Ayes 12. Noes 0.) (April 22).
lower
Apr 8, 2026
Lower · Passed
In committee: Set, first hearing. Hearing canceled at the request of author.
lower
Mar 23, 2026
Committee
Re-referred to Com. on U. & E.
lower
Mar 19, 2026
Introduced
From committee chair, with author's amendments: Amend, and re-refer to Com. on U. & E. Read second time and amended.
lower
Mar 19, 2026
Committee
Referred to Com. on U. & E.
lower
Feb 11, 2026
Lower · Passed
From printer. May be heard in committee March 13.
lower
1 primary · 1 co-sponsor

Sponsors