Amends the Public Utilities Act. In provisions concerning the exercise of eminent domain powers by a public utility, provides that an owner or operator of a pipeline designed, constructed, and operated to transport carbon dioxide to which the Illinois Commerce Commission has granted a certificate under the Carbon Dioxide Transportation and Sequestration Act shall not seek or exercise eminent domain authority from the Commission. Amends the Carbon Dioxide Transportation and Sequestration Act. Provides that a certificate of authority does not grant an owner or operator of a carbon dioxide pipeline the authority to take and acquire an easement in any property or interest in property for the construction, maintenance, or operation of a carbon dioxide pipeline through the exercise of eminent domain power. Removes corresponding provisions concerning eminent domain.
Creates the Electric Transmission Colocation and Siting Priority Act. Defines terms. Requires that, in the siting of new electric transmission facilities, available corridors be used in the following order of priority: (1) existing public utility corridors; (2) State highway corridors; and (3) new corridors. Provides that a public utility or transmission developer may construct, place, or maintain a high-voltage transmission line on a public right-of-way or along a highway if (i) the public utility or transmission developer submits a colocation request for the high-voltage transmission line to the Secretary of Transportation and (ii) the Secretary reviews and approves the colocation request. Provides that the Secretary may deny a colocation request if the Secretary determines that the construction, placement, or maintenance of a high-voltage transmission line on a public right-of-way or along a highway would endanger public safety or would interfere with the proper function of the highway. Provides that a public utility or transmission developer may submit a written request to the Department of Transportation for an evaluation of certain corridors for possible locations for a high-voltage transmission line. Provides that, within 30 days after receipt of a written request, the Secretary shall assign a project coordinator to the request. Provides that a project coordinator, upon assignment to a request, shall begin the evaluation in coordination with the applicable public utility or transmission developer. Requires a public utility or transmission developer to develop a constructability report in consultation with the Department and requires the public utility or transmission developer and the Department to follow the terms and conditions of the constructability report during the planning and approval process for the siting of a high-voltage transmission line. Sets forth requirements for the content of the constructability report. Provides that, if the Department requires that a high-voltage transmission line on a public right-of-way be relocated by a specific date, the Department shall give the applicable public utility or transmission developer notice of the required relocation no less than 10 years before the date of the required relocation. Makes other changes. Effective January 1, 2027.
Creates the Electric Transmission Facilities Siting Act. Defines terms. Requires that, in the siting of new electric transmission facilities, available corridors be used in the following order of priority: (1) existing public utility corridors; (2) highway corridors; and (3) new corridors. Provides that a public utility or developer may construct, place, or maintain a high-voltage electric service line on a public right-of-way or along a highway if (i) the public utility or developer submits a colocation request for the high-voltage electric service line to the Secretary of Transportation and (ii) the Secretary reviews and approves the colocation request. Requires a public utility or developer to develop a constructability report in consultation with the Department of Transportation and requires the public utility or developer and the Department to follow the terms and conditions of the constructability report during the planning and approval process for the siting of a high-voltage electric service line. Sets forth requirements for the content of the constructability report. Amends the Public Utilities Act. In provisions concerning distributed generation rebates, provides that the owner or operator of distributed generation that, before January 1, 2025 (rather than before the threshold date), is eligible for net metering under the Act may apply for a base rebate for an associated energy storage device behind the same retail customer meter as the distributed generation, regardless of whether the distributed generation applies for a rebate for the distributed generation device. Provides that, after the threshold date, a stand-alone energy storage system that is neither paired with distributed generation nor with any electric load beyond the electric load that is used by the energy storage system itself (rather than a stand-alone energy storage system) shall be compensated with a rebate of $250 per kilowatt-hour of nameplate capacity. Amends the Environmental Protection Act. In provisions concerning greenhouse gases, provides that the Environmental Protection Agency and the Illinois Power Agency shall file a plan to reduce or delay certain emissions reductions requirements with the Illinois Commerce Commission for review in conjunction with the integrated resource plan under certain provisions of the Public Utilities Act. Makes other changes. Effective immediately.
Creates the Electric Transmission Facilities Siting Act. Defines terms. Requires that, in the siting of new electric transmission facilities, available corridors be used in the following order of priority: (1) existing public utility corridors; (2) highway corridors; and (3) new corridors. Provides that a public utility or developer may construct, place, or maintain a high-voltage electric service line on a public right-of-way or along a highway if (i) the public utility or developer submits a colocation request for the high-voltage electric service line to the Secretary of Transportation and (ii) the Secretary reviews and approves the colocation request. Provides that the Secretary may deny a colocation request if the Secretary determines that the construction, placement, or maintenance of a high-voltage electric service line on a public right-of-way or along a highway would endanger public safety or would interfere with the proper function of the highway. Provides that a public utility or developer may submit a written request to the Department of Transportation for an evaluation of certain corridors for possible locations for a high-voltage electric service line. Provides that, within 30 days after receipt of a written request, the Secretary shall assign a project coordinator to the request. Provides that a project coordinator, upon assignment to a request, shall begin the evaluation in coordination with the applicable public utility or developer. Requires a public utility or developer to develop a constructability report in consultation with the Department and requires the public utility or developer and the Department to follow the terms and conditions of the constructability report during the planning and approval process for the siting of a high-voltage electric service line. Sets forth requirements for the content of the constructability report. Provides that, if the Department requires that a high-voltage electric service line on a public right-of-way be relocated by a specific date, the Department shall give the applicable public utility or developer notice of the required relocation no less than 10 years before the date of the required relocation. Makes other changes. Effective immediately.
Amends the Public Utilities Act. In provisions concerning the exercise of eminent domain powers by a public utility, provides that an owner or operator of a pipeline designed, constructed, and operated to transport carbon dioxide to which the Illinois Commerce Commission has granted a certificate under the Carbon Dioxide Transportation and Sequestration Act shall not seek or exercise eminent domain authority from the Commission. Amends the Carbon Dioxide Transportation and Sequestration Act. Provides that a certificate of authority does not grant an owner or operator of a carbon dioxide pipeline the authority to take and acquire an easement in any property or interest in property for the construction, maintenance, or operation of a carbon dioxide pipeline through the exercise of eminent domain power. Removes corresponding provisions concerning eminent domain.
Amends the Illinois Hydraulic Fracturing Tax Act. Provides that 80% of the moneys received under the Act on or after the effective date of the amendatory Act shall be paid into the Pension Stabilization Fund and 20% of those moneys shall be paid into the Carbon Dioxide Pipeline Fund. Amends the State Finance Act to create the Carbon Dioxide Pipeline Fund. Provides that moneys in the Fund shall be used by the Illinois Commerce Commission to supervise and regulate the operations of the carbon dioxide pipeline industry in Illinois. Effective immediately.
Provides that the amendatory Act may be referred to as the Fast-Track Nuclear Now Act. Amends the Public Utilities Act. Removes prohibitions on the construction of a new nuclear power reactor with a nameplate capacity of more than 300 megawatts of electricity that is located within the State. Amends the Illinois Nuclear Facility Safety Act. Provides that it is declared to be the policy of the State to facilitate new nuclear facility construction. Makes a conforming change. Provides that the Illinois Emergency Management Agency and Office of Homeland Security shall work with any proposed project, the federal Nuclear Regulatory Commission, and any relevant State agency to reduce regulatory barriers to new nuclear facility construction. Effective immediately.