Issue · Energy

Energy (Electric Grid)

Every energy bill, vote, and legislator stance in New Jersey, automatically classified by Maddy, our AI policy reader.

Total bills
33
2026-2027 Regular Session
Top supporter
-
no data yet
Top opponent
-
no data yet
Ranked legislators
0
0 support · 0 oppose
Showing 21–30 of 33 bills

All energy bills

in committee · New Jersey · Senate Feb 12, 2026

S 2189: Requires BPU to study potential deployment of advanced transmission technologies in NJ.

S 2189 (New Jersey Senate Bill 2189) requires the New Jersey Board of Public Utilities (BPU) to study the potential deployment of advanced transmission technologies, such as high-performance conductors, power flow control systems, and grid-enhancing software. The study will evaluate how these technologies could reduce grid congestion, increase transmission capacity, and improve reliability for electric utilities serving New Jersey consumers. The BPU must analyze specific benefits including cost savings, faster deployment timelines (3 months to 3 years versus 10 years for traditional infrastructure), and how these technologies address existing grid bottlenecks. This is a procedural study bill with no immediate policy changes; it mandates analysis to inform future decisions about grid modernization.
in committee · New Jersey · Senate Jan 13, 2026

S 626: Establishes Nuclear Power Advisory Commission.

S 626 establishes a 9-member Nuclear Power Advisory Commission within New Jersey's Department of Environmental Protection. The commission must study nuclear energy's role in the state's energy future, specifically examining its value as a reliable zero-emission power source for climate goals, impacts of plant closures on grid reliability and electricity costs, emerging small-scale nuclear technologies, and other states' nuclear policies. The commission, including ex-officio members and six gubernatorial appointees representing nuclear plants, academia, environmental groups, business, and labor, must submit a report within 18 months. The bill expires 30 days after the report is submitted.
Sub-Topics Electric Grid Nuclear
passed · New Jersey · Senate Mar 23, 2026

SR 18: Urges states in PJM Interconnection region to require data centers to obtain electricity from new zero- or low-emission sources of energy.

SR 18 is a non-binding Senate resolution urging states within the PJM Interconnection region (including New Jersey and 12 other states plus D.C.) to require data centers to source electricity from new zero- or low-emission energy sources. It does not create new regulations but calls on state governments to adopt policies addressing data centers' growing energy demands, which currently consume about 4% of U.S. electricity and are projected to reach 9% by 2030. The resolution cites concerns about grid strain, noting data centers use 10-50x more energy than typical offices and could double demand by 2030. It emphasizes clean energy sources like solar and wind as scalable solutions to support grid reliability and climate goals.
in committee · New Jersey · Senate Mar 16, 2026

S 680: Requires energy usage plan for proposed artificial intelligence data centers and cryptocurrency mining facilities; requires all electricity for artificial intelligence data centers and cryptocurrency mining facilities to be derived from new clean energy sources.

S 680 requires new artificial intelligence (AI) data centers and cryptocurrency mining facilities in New Jersey to use electricity exclusively from new renewable energy sources or newly constructed nuclear power. Applicants must submit an energy usage plan to the Board of Public Utilities detailing how they will minimize energy use for cooling, optimize water sourcing, and improve building efficiency. The bill aims to prevent these facilities from increasing strain on the state's power grid and raising electricity costs for ratepayers. All electricity must be derived from new clean sources as measured hourly, with no net decrease in verifiable clean energy on the grid.
in committee · New Jersey · Senate Jan 13, 2026

S 93: Requires electric distribution lines to be located underground in areas affected by severe weather or natural disasters.

This bill requires electric utilities in New Jersey to place new or repaired power lines underground in areas affected by major disasters like hurricanes, floods, or ice storms that cause widespread outages (affecting at least 10% of customers in a region or triggering a state of emergency). The Board of Public Utilities (BPU) must establish feasibility standards considering engineering, permits, and local approvals, but underground placement is mandatory for new installations or post-disaster repairs in those zones. It does not apply to all areas or existing lines, only to future work in locations impacted by qualifying disasters. The policy aims to reduce future power outages caused by weather events, though implementation depends on BPU's standards and utility feasibility assessments.
Sub-Topics Electric Grid
in committee · New Jersey · Senate Jan 13, 2026

S 1237: Directs BPU to conduct study to determine whether microgrid and distributed energy resource deployment will reduce length of power outages.

This bill directs New Jersey's Board of Public Utilities (BPU) to study whether microgrids and small-scale power systems (like rooftop solar) can reduce the duration of extended power outages. The BPU must compare New Jersey's grid performance to other states, assess real-world microgrid impacts during outages, consult with utilities and experts, and evaluate costs for ratepayers and the state. The study requires the BPU to submit findings and recommendations to the Governor and Legislature within nine months. It does not change existing laws or fund new projects - it solely mandates a data-gathering study to inform future energy resilience decisions.
in committee · New Jersey · Senate Mar 2, 2026

S 688: Requires Commissioner of Community Affairs to amend or supplement State Uniform Construction Code concerning use of balcony solar panel systems.

This bill requires New Jersey's Commissioner of Community Affairs to create safety guidelines for installing small balcony solar panel systems (defined as plug-in devices under 1,500 square inches that don't connect to the power grid). The guidelines will cover wiring modifications for both U.S.-designed systems and systems imported from other countries that need adaptation. These rules will be added to the State Uniform Construction Code to ensure safe home installations. The bill directly affects homeowners and renters in New Jersey who wish to use commercially available balcony solar panels.
in committee · New Jersey · Senate Jan 13, 2026

S 674: Requires electric public utilities to upgrade certain portions of electric transmission and distribution system with advanced conductors.

S 674 requires New Jersey's electric utilities to upgrade portions of their transmission and distribution systems with "advanced conductors" during routine maintenance or dedicated projects, where practical. These conductors reduce energy loss by at least 10% compared to standard wires by using more efficient designs (like carbon fiber cores). Utilities must assess their systems within one year of the law's effective date and propose specific upgrade locations to the Board of Public Utilities. They may also request approval to recover the costs of these upgrades through customer electricity bills.
in committee · New Jersey · Senate Jan 13, 2026

S 657: Requires electric public utilities to develop and implement grid modernization plans; appropriates $300 million.

This bill requires New Jersey's electric public utilities to create and implement grid modernization plans within one year. The plans must address projects like improving storm resilience, integrating renewable energy, and meeting climate goals, with cost estimates and timelines. Utilities can recover implementation costs through rate adjustments, while a new $300 million Grid Modernization Ratepayer Relief Fund will provide financial assistance to customers facing rate increases. The Board of Public Utilities reviews and approves these plans, ensuring they align with state climate objectives and cost-effectiveness. The bill directly affects all electric utilities operating in New Jersey and their ratepayers.
in committee · New Jersey · Senate Jan 13, 2026

S 641: Requires electric public utilities to submit to BPU and implement integrated distribution plans.

S 641 requires New Jersey's electric public utilities (companies delivering electricity to homes and businesses) to create and submit "integrated distribution plans" to the Board of Public Utilities (BPU). These plans must address infrastructure upgrades for safety and reliability, support smaller energy sources like rooftop solar, and ensure customer benefits. The BPU must first set plan criteria within six months, then utilities must submit plans one year later. If approved, utilities must implement the plans; if rejected, they must revise and resubmit within 90 days.
Sub-Topics Electric Grid Solar
Showing 21 to 30 of 33 bills
Previous 1 2 3 4 Next