S 2189 New Jersey Senate · 2026-2027 Regular Session

Requires BPU to study potential deployment of advanced transmission technologies in NJ.

S 2189 (New Jersey Senate Bill 2189) requires the New Jersey Board of Public Utilities (BPU) to study the potential deployment of advanced transmission technologies, such as high-performance conductors, power flow control systems, and grid-enhancing software. The study will evaluate how these technologies could reduce grid congestion, increase transmission capacity, and improve reliability for electric utilities serving New Jersey consumers. The BPU must analyze specific benefits including cost savings, faster deployment timelines (3 months to 3 years versus 10 years for traditional infrastructure), and how these technologies address existing grid bottlenecks. This is a procedural study bill with no immediate policy changes; it mandates analysis to inform future decisions about grid modernization.
Bill status in committee 1 of 4 stages cleared
Introduction
Jan 2026
Committee Review
Floor Vote
Governor
Introduced Jan 13, 2026 Last action Feb 12, 2026
Maddy AI version diff · 1 comparison

What changed between versions

Technical Review Of Prefiled Bill Introduced · 2 edits · Jan 13, 2026
MINOR
This is a procedural transition from the Senate Economic Growth Committee's technical review stage to formal introduction. The operative text of the bill is unchanged. A legislative summary statement was added at the end describing the bill's requirements for the Board of Public Utilities to study advanced transmission technologies, hold public stakeholder meetings, and submit a report within one year of enactment.
TECHNICAL

The bill status changed from 'As reported by the Senate Economic Growth Committee with technical review' to 'Introduced Pending Technical Review by Legislative Counsel,' reflecting its progression through the legislative process.

A legislative summary statement was appended to the bill describing its contents: requiring the Board of Public Utilities to study advanced transmission technologies (ATT), evaluate nine specific areas including costs, benefits, grid congestion mitigation, and out-of-state policies, hold at least two public stakeholder meetings, submit a written report within one year of enactment, and defining 'advanced transmission technology' as software or hardware that increases capacity, efficiency, reliability, or safety of electric transmission facilities.

Floor votes

How they voted

No floor votes recorded yet.
Full legislative history

Actions timeline

Total actions
3
Key actions
0
Committee
1
Feb 12, 2026
Committee
Referred to Senate Budget and Appropriations Committee
upper
Jan 13, 2026
Introduced
Introduced in the Senate, Referred to Senate Economic Growth Committee
upper
2 primary · 1 co-sponsor

Sponsors