Provides a credit against state tax liability for expenses incurred in the manufacture of a small modular nuclear reactor (SMR) in Indiana. Establishes procedures under which certain energy utilities may request approval for one or more of the following from the Indiana utility regulatory commission (IURC): (1) An expedited generation resource plan (EGR plan) to meet customer load growth that exceeds a specified threshold. (2) A generation resource submittal for the acquisition of a specific generation resource in accordance with an approved EGR plan. (3) A project to serve one or more large load customers. Sets forth: (1) the requirements for approval of each of these types of requests; (2) standards for financial assurances by large load customers; and (3) cost recovery mechanisms for certain acquisition costs or project costs incurred by energy utilities. Amends the statute concerning public utilities' annual electric resource planning reports to the IURC to provide that for an annual report submitted after December 31, 2025, a public utility must include information as to the amount of generating resource capacity or energy that the public utility plans to retire or refuel with respect to any electric generation resource of at least 125 megawatts. Provides that for any planned retirement or refueling, the public utility must include, along with other specified information, information as to the public utility's plans with respect to the following: (1) For a retirement, the amount of replacement capacity identified to provide approximately the same accredited capacity within the appropriate regional transmission organization (RTO) as the capacity of the facility to be retired. (2) For a refueling, the extent to which the refueling will maintain or increase the current generating resource accredited capacity or energy that the electric generating facility provides, so as to provide approximately the same accredited capacity within the appropriate RTO. Requires IURC staff to prepare a staff report for each public utility report that includes a planned electric generation resource retirement. Provides that if, after reviewing a public utility's report and any related staff report, the IURC is not satisfied that the public utility can satisfy both its planning reserve margin requirement and the statute's prescribed reliability adequacy metrics, the IURC shall conduct an investigation into the reasons for the public utility's inability to meet these requirements. Provides that if the public utility's report indicates that the public utility plans to retire an electric generating facility within one year of the date of the report, the IURC must conduct such an investigation. Provides that: (1) a public utility may request, not earlier than three years before the planned retirement date of an electric generation facility, that the IURC conduct an investigation into the planned retirement; and (2) if the IURC conducts an investigation at the request of the public utility within that three year period, the IURC may not conduct a subsequent investigation that would otherwise be required under the bill's provisions unless the IURC is not satisfied that the public utility can satisfy both its planning reserve margin requirement and the statutory reliability adequacy metrics as of the time the investigation would otherwise be required. Provides that if a CPCN is granted by the IURC for a facility intended to repower or replace a generation unit that is planned for retirement, and the CPCN includes findings that the project will result in at least equivalent accredited capacity and will provide economic benefit to ratepayers as compared to the continued operation of the generating unit to be retired, the CPCN constitutes approval by the IURC for purposes of an investigation that would otherwise be required. Provides that if, after an investigation, the IURC determines that the capacity resources available to the public utility will not be adequate to allow the public utility to satisfy both its planning reserve margin requirements and the statute's prescribed reliability adequacy metrics, the IURC shall issue an order: (1) directing the public utility to acquire or construct; or (2) prohibiting the retirement or refueling of; such capacity resources that are reasonable and necessary to enable the public utility to meet these requirements. Provides that if the IURC does not issue an order in an investigation within 120 days after the initiation of the investigation, the public utility is considered to be able to satisfy both its planning reserve margin requirement and the statutory reliability adequacy metrics with respect to the retirement of the facility under investigation. Provides that if the IURC issues an order to prohibit the retirement or refueling of an electric generation resource, the IURC shall create a sub-docket to authorize the public utility to recover in rates the costs of the continued operation of the electric generation resource proposed to be retired or refueled, subject to a finding by the IURC that the continued costs of operation are just and reasonable. Makes a technical change to another Indiana Code section to recognize the redesignation of subsections within the section containing these provisions.
Rep. David Abbott
Sponsored bills
Requires the coroner where the incident occurred to respond to the coroner where the death occurred not more than 24 hours after being contacted to discuss the need for an autopsy. Provides that if the coroner where the incident occurred does not timely respond, the coroner where the death occurred may conduct an autopsy and bill the coroner where the incident occurred. Provides that beginning January 1, 2026, a licensed hospital is required to have a blood retention protocol for the preservation of the first sample of blood drawn from an individual after arriving at a hospital for treatment. Specifies the required elements of the blood retention protocol, including how long a laboratory is required to hold a blood sample in storage. Provides for waiver of the blood sample storage requirement in any case where the sample is tested and cannot be retained for reasons of medical necessity in the clinical care of the patient.
Defines "squatter" as an individual who occupies the property of another and who does not have and has never had: (1) a rental agreement; (2) permission of the owner; or (3) another legal interest in the property. Permits a property owner to execute an affidavit stating that a squatter is occupying the person's property, and requires a law enforcement agency to dispatch one or more law enforcement officers to remove the squatter within 48 hours (or a later period if necessary for reasons of public safety). Provides that a property owner can execute an affidavit at the time a law enforcement officer responds to a complaint that a squatter is occupying the owner's property. Requires a dispatched law enforcement officer to remove the squatter from the property unless the law enforcement officer discovers credible evidence that the person is not a squatter. Provides that a law enforcement agency may create a form affidavit. Provides certain immunities to a law enforcement agency and a law enforcement officer. Establishes a cause of action for wrongful removal from property.
Maddy summaryHR 68 is a resolution introduced to honor Captain Adam J. Kuspa. It was authored by Representative Miller D and coauthored by Representatives Wesco, King, and Abbott.
Maddy summaryHouse Concurrent Resolution 43 is a non-binding resolution that expresses the Indiana legislature's support for a healthier Indiana. It serves to formally encourage initiatives and efforts aimed at improving the well-being of the state's residents.
Provides that, for a hunting season beginning after June 30, 2025, rifles may be used to hunt deer on public property subject to certain restrictions. Removes certain rifle case length limitations and provides that a hunter may use a rifle chambered for a centerfire rifle cartridge that fires a bullet that is at least five and fifty-six hundredths (5.56) of a millimeter in diameter or larger to hunt deer. Prohibits the department of natural resources from adopting rules regarding centerfire rifle case length limitations.
Allows the owner or operator of a significant ground water withdrawal facility to file a complaint with the director of the department of natural resources (director) that a water well on the property of the owner of the significant ground water withdrawal facility failed to furnish the well's normal supply of water or failed to furnish potable water. Requires the director to launch an investigation into a complaint of a well failure from a significant ground water withdrawal facility within three business days of the director receiving the complaint. Provides that the owner of a significant ground water withdrawal facility responsible for the failure or substantial impairment of a well shall provide timely and reasonable compensation to the owner of an impacted significant ground water withdrawal facility or nonsignificant ground water withdrawal facility.
Maddy summarySB 520 grants an exemption to certain nonprofit cemeteries that specifically serve veterans. This bill relieves these particular cemeteries from having to follow specific deposit and trustee requirements for their perpetual care funds. These funds are typically established to ensure the long-term maintenance and upkeep of the cemetery.
Maddy summaryHCR 41 is a symbolic concurrent resolution expressing support for shifting education policy authority from the federal U.S. Department of Education to individual states. It does not change existing laws or create new requirements; instead, it formally advocates for states to have greater control over education decisions. The resolution was coauthored by multiple state representatives and referred to the Education Committee for consideration. As a non-binding resolution, it directly affects only the legislative record, not actual education policy implementation.
Provides that it is the continuing policy of the state to recognize natural gas and propane as "clean energy" or "green energy" for purposes of any state or federal program that provides funding or other incentives for: (1) clean energy initiatives or projects; (2) green energy initiatives or projects; or (3) any similarly designated initiatives or projects; in Indiana. Defines "clean energy" or "green energy" for these purposes. Specifies that the term: (1) includes natural gas and propane, wind energy, solar energy, photovoltaic cells and panels, hydropower, fuel cells, hydrogen, geothermal energy, and nuclear energy; and (2) does not affect certain existing definitions set forth in the Indiana Code.