Issue · Energy

Energy

Every energy bill, vote, and legislator stance in Delaware, automatically classified by Maddy, our AI policy reader.

Total bills
22
153rd General Assembly (2025-2026)
Top supporter
Laura Sturgeon
100% support rate
Top opponent
Dave Wilson
0% support rate
Ranked legislators
10
5 support · 5 oppose
Key legislators

Who's moving energy in Delaware

Legislators moving energy in Delaware
Legislator Party Stance Support rate Votes
Laura Sturgeon
Laura Sturgeon Senate · District 4
D
Strong +
100% 17
Dave Sokola
Dave Sokola Senate · District 8
D
Strong +
100% 17
Stephanie Hansen
Stephanie Hansen Senate · District 10
D
Strong +
100% 17
Darius Brown
Darius Brown Senate · District 2
D
Strong +
100% 15
Ray Seigfried
Ray Seigfried Senate · District 5
D
Strong +
100% 17
Dave Wilson
Dave Wilson Senate · District 18
R
Strong −
0% 16
Dave Lawson
Dave Lawson Senate · District 15
R
Strong −
0% 17
Brian Pettyjohn
Brian Pettyjohn Senate · District 19
R
Strong −
0% 17
Gerald Hocker
Gerald Hocker Senate · District 20
R
Strong −
0% 16
Tim Dukes
Tim Dukes House · District 40
R
Strong −
0% 22
Showing 11–20 of 22 bills

All energy bills

passed both · Delaware · House Jan 29, 2026

HCR 94: URGING PJM INTERCONNECTION TO MAINTAIN PRICE COLLARS AT THE CURRENT RATE AND ENCOURAGING REFORMS TO THE INTERCONNECTION QUEUE.

This concurrent resolution urges PJM Interconnection to extend price collars for 2 years at the current rate of $325/mw-day and to implement reforms to its interconnection queue to allow for increased generation capacity to come online faster and prevent the need for price collars in the future.
Sub-Topics Transmission
signed · Delaware · House May 21, 2026

HB 269: AN ACT TO AMEND TITLE 26 OF THE DELAWARE CODE RELATING TO NET-METERING AND INTERCONNECTION RULES.

This Act requires that an electric supplier’s interconnection rules, for purposes of net-metering, align with the most recent version of the Interstate Renewable Energy Council’s Model Interconnection Procedures (Procedures) within 12 months of the Procedures’ latest publishing date.
signed · Delaware · Senate Feb 14, 2025

SJR 1: DIRECTING ALL ELECTRIC UTILITIES IN DELAWARE THAT OFFER NET METERING TO SOLAR CUSTOMERS TO CONTINUE TO PARTICIPATE IN A COST-BENEFIT STUDY AND ANALYSIS OF NET METERING, INCLUDING COST BURDENS AND COST SHIFTING, UNDERTAKEN BY THE DELAWARE SUSTAINABLE ENERGY UTILITY, AND EXTENDING THE REPORTING DATE.

Senate Joint Resolution No. 3 was passed by the 152nd General Assembly and signed by the Governor. SJR No. 3 directed all electric utilities in Delaware that offer net metering to solar customers to participate in a cost-benefit study and analysis of net metering in Delaware being undertaken by the Delaware Sustainable Energy Utility to address issues such as cost burdens and cost shifting to non-solar customers. The DESEU was to issue a report by December 31, 2024. However, due to the scope and complexity of the net metering study, the DESEU requires additional time to issue the report. This resolution reinstates the requirements of SJR No. 3 and extends the DESEU's reporting deadline to complete the cost-benefit study and analysis and finalize and issue a report to April 30, 2025.
Sub-Topics Solar
signed · Delaware · House Jul 16, 2025

HB 116: AN ACT TO AMEND TITLE 26 OF THE DELAWARE CODE RELATING TO PUBLIC UTILITY RATES.

This Act provides the Public Service Commission with the flexibility to consider and approve a discounted gas or electric residential utility rate for qualified low-income customers, provided the discount is 20% of standard residential distribution rates. This permits low-income customers to receive utility distribution services at a lower cost. A utility offering a discounted low-income rate is responsible for annually determining customer eligibility in cooperation with the Department of Health and Social Services. The Public Service Commission must review any discount rate approved under this Act every five years to determine if the discount rate should be re-authorized.
Sub-Topics Utility Regulation
in committee · Delaware · House Apr 16, 2025

HB 80: AN ACT TO AMEND TITLE 26 OF THE DELAWARE CODE RELATING TO RENEWABLE ENERGY PORTFOLIO STANDARDS.

The Renewable Portfolio Standard (RPS) is the percentage of electricity that utilities must source from renewables. This is presently set at 25% and will increase annually, culminating at 40% in 2035. Delaware does not currently have enough renewable energy to meet the present mandate, let alone future RPS requirements. Renewable energy is also in short supply on the regional power grid. If it is available, consumers are paying additional distribution charges to transmit it to Delaware. If renewable energy is not obtainable, Delaware utilities are paying penalties to the state for failing to achieve the RPS mandate. In each of the last two years, Delmarva Power has spent about $13 million annually in such state mandated compliance fees. All these cost multipliers are being passed along to consumers, making power more expensive for Delaware ratepayers. This bill recognizes the current flawed public energy policy that has resulted in renewable energy demand significantly outpacing supply. This legislation seeks to provide relief to Delawareans by rolling back the Renewable Portfolio Standard to 10% and maintaining the RPS requirement for the next 10 years, providing sufficient time for renewable generation capacity to meet demand. After the 10-year period expires, the RPS percentage will resume scheduled annual increases.
in committee · Delaware · House Mar 18, 2026

HB 186: AN ACT TO AMEND TITLE 30 OF THE DELAWARE CODE RELATING TO BUSINESS TAX CREDITS AND DEDUCTIONS FOR ELECTRICITY PRODUCTION.

The purpose of this bill is to incentivize the construction and operation of a limited number of high-efficiency Combined-Cycle Gas Turbine (CCGT) electrical generation facilities, with an output of between 100 MW and 500 MW, by creating an Electricity Production Tax Credit (EPTC) and bonus credits. These credits would offset state corporate tax liability while facilitating the increased availability of clean, cost-effective, high-efficiency, and energy production. CCGT power plants are proven technology that can provide significant dispatchable power production to meet Delaware’s growing need for dependable energy, while promoting grid stability that will enable the integration of renewable energy generation. Having the CCGT facilities built within Delaware will improve the energy security of our citizens while reducing power transmission charges and energy loss. The value of the Electricity Production Tax Credit (EPTC) can be increased via bonus credits if the CCGT power-generating facility is built on a brownfield or the current or former site of a power plant. Additional bonus credits can be earned if the plant’s operation exceeds certain high-efficiency thresholds and if it incorporates carbon-capture technology into the design. The value of the credits realized by the facility operator would result from the quantity of electricity delivered. Most CCGT plants operate at a capacity factor of 50% to 85%. A 500 MW power plant, operating within these margins, would be expected to produce somewhere between 2.2 million and 3.7 million MWh per year. At a maximum annual 65% production capacity, a 500 MW plant could serve the needs of approximately 210,000 homes. The total value of the credits for each eligible facility receiving the tax credits established under this bill is limited to $15 million annually. The number of facilities eligible for the tax credits established under this bill will be no more than three statewide.
in committee · Delaware · Senate Jan 28, 2026

SB 64: AN ACT TO AMEND TITLE 7 OF THE DELAWARE CODE RELATING TO REGIONAL GREENHOUSE GAS INITIATIVE AND CO2 EMISSIONS TRADING PROGRAM AUCTION PROCEEDS.

Subchapter 11-A of Title 7 delineates the Regional Green House Gas initiative, including where proceeds from C02 allowance auctions shall be expended. This Act fixes the overall amount of proceeds directed to purposes currently in the Delaware Code to 2025 levels and instructs DNREC that any auction proceeds above 2025 levels be directed to a rebate program to defray the cost of electricity to ratepayers. Under this Act, DNREC would provide rebate proceeds to the appropriate electric utility or distribution company for payment in the form of electric bill reductions to retail electric customers.
Sub-Topics Climate Change
signed · Delaware · Senate Jun 30, 2025

SB 159: AN ACT TO AMEND TITLE 26 OF THE DELAWARE CODE RELATING TO PUBLIC UTILITIES.

This Act requires the permitting of an electric substation as an allowed conditional use in a heavy industrial zone under certain conditions set forth in the Act, including that the electrical substation is being constructed to support the operation of a proposed renewable energy generation project of 250 MW or greater. This Act is being given retroactive effect such that, if a county has previously denied an application for an electrical substation that would meet the requirements of this Act, then the application shall be deemed granted provided that the electrical substation meets the requirements of this Act.
Sub-Topics Renewable Energy
signed · Delaware · Senate Jul 16, 2025

SJR 3: DIRECTING ALL ELECTRIC PUBLIC UTILITIES IN DELAWARE TO PARTICIPATE IN A STUDY TO BE UNDERTAKEN BY THE DELAWARE SUSTAINABLE ENERGY UTILITY TO ASSESS AND ANALYZE THE COSTS AND BENEFITS OF THE ADOPTION OF ENERGY STORAGE SYSTEMS IN DELAWARE, AND DIRECTING THE DELAWARE SUSTAINABLE ENERGY UTILITY TO CONDUCT A PILOT PROGRAM WITH THE PARTICIPATION AND COOPERATION OF CERTAIN ELECTRIC UTILITIES TO DEVELOP AND DEPLOY PILOT PROJECTS INVOLVING BATTERY STORAGE SYSTEMS IN DELAWARE.

Energy Storage Systems provide benefits to the electric grid, including grid stabilization, managing peak energy demand, and providing backup power during outages. Energy Storage Systems can provide substantial cost savings to residential, commercial, and industrial electricity customers. The construction of Energy Storage Systems will promote economic growth and job creation in Delaware. This resolution directs the Delaware Sustainable Energy Utility (DESEU) to initiate and undertake a study to assess and analyze the costs and benefits of the adoption of Energy Storage Systems, both in front of and behind the meter, by all electric public utilities in Delaware. The resolution also directs the DESEU to conduct a pilot program and provide guidance and a level of funding, to be determined by the DESEU, to support Delmarva Power & Light Company, the Delaware Municipal Electric Corporation, the Delaware Electric Cooperative, and one independent power producer to deploy at least one battery storage pilot project in Delaware to serve their Delaware service territory. The DESEU is to submit a comprehensive report detailing the findings from the battery storage pilot program and the cost-benefit study and analysis of Energy Storage Systems in Delaware on or before June 1, 2026.
signed · Delaware · House Jul 16, 2025

HJR 3: DIRECTING ALL ELECTRIC UTILITIES IN DELAWARE TO PARTICIPATE IN AN ANALYSIS OF THE POTENTIAL FOR ADOPTION OF GRID-ENHANCING TECHNOLOGIES, INCLUDING BENEFITS, COST BURDENS AND COST SHIFTING, FEASIBILITY AND BARRIERS TO ADOPTION UNDERTAKEN BY THE DNREC STATE ENERGY OFFICE AND THE DELAWARE SUSTAINABLE ENERGY UTILITY.

Grid-enhancing technologies (GETs) offer efficient tools to increase power grid capacity without the need for new transmission lines. Studies demonstrate that these innovations can double renewable energy integration, create hundreds of thousands of jobs, and significantly expand interzonal transmission capacity. By 2035, GETs and reconductoring could help the U.S. achieve 90% emissions-free electricity. This resolution directs the DNREC State Energy Office (DNREC SEO) and the Delaware Sustainable Energy Utility (DESEU) to conduct a comprehensive cost-benefit analysis of GETs across all electric utilities in Delaware. The study shall assess ratepayer costs, technical feasibility, and implementation plans. DNREC SEO and DESEU are tasked with collaborating with the electric utilities, the Department of Natural Resources and Environmental Control, the Division of the Public Advocate, and other interested stakeholders and must submit a detailed preliminary report of its findings to the Governor and all members of the General Assembly by December 31, 2025, and a final report by July 31, 2026.
Showing 11 to 20 of 22 bills