Discharging preproduction plastic; regulation, requirements.
Summary
Regulation of discharging preproduction plastic; requirements. Requires the Department of Environmental Quality to establish a program to ensure zero discharge or release from point and nonpoint source at certain facilities that discharge to (i) a surface water under a Virginia Pollutant Discharge Elimination System permit issued by the Department or (ii) a publicly owned treatment works under an industrial pretreatment program permit or other written authorization issued by a local permit control authority and to require the prompt and environmentally responsible containment and cleanup of discharged or released preproduction plastic. The bill requires the Department to adopt and implement certain requirements in order to reduce and control the discharge or release of preproduction plastic from such facilities. The bill allows the Department to exempt a facility from the requirements of the program if a facility satisfies the criteria for a no exposure certification and complies with inspection requirements administered by the Department. The bill also allows the Department to establish additional requirements regarding the regulation of discharges and releases of preproduction plastic from certain facilities into water or onto land in the Commonwealth.
Bill status
in committee
1 of 4 stages cleared
Introduction
Jan 2025
Committee Review
Floor Vote
Governor
Introduced Jan 7, 2025
Last action Feb 4, 2025
Maddy AI version diff · 1 comparison
What changed between versions
Introduced
→
HACNR Sub: Chesapeake Substitute
·
4 edits
MODERATE
The bill moved from introduction to committee substitute status, with substantive changes to enforcement requirements. The Department must now include zero-discharge effluent limitations in permits rather than just establishing a program. Monitoring requirements were strengthened to mandate continuous technology at outfalls. The exemption process now requires on-site inspections and off-site area checks before approval.
Scope change
The bill's scope remains the same - it still regulates preproduction plastic discharges from facilities in Virginia - but enforcement mechanisms and permit requirements have been strengthened.
REQUIREMENT
Changed from requiring the Department to establish a program to requiring specific effluent limitations with zero discharge or release in VPDES permits, industrial pretreatment programs, and stormwater permits.
Added requirement for continuous monitoring technology that can detect preproduction plastic at wastewater and stormwater outfalls.
ENFORCEMENT
Strengthened exemption process by requiring on-site inspections and off-site area inspections (at least 50 feet in all directions) before approving any facility exemption.
TECHNICAL
Added VPDES acronym definition and changed lettering from (i)/(ii) to (a)/(b) in the permit requirements section.
Floor votes
How they voted
No floor votes recorded yet.
Full legislative history
Actions timeline
Total actions
6
Key actions
1
Committee
3
Jan 27, 2025
Lower · Passed
Subcommittee recommends laying on the table (10-Y 0-N)
lower
Jan 17, 2025
Committee
Assigned ACNR sub: Chesapeake
lower
Jan 7, 2025
Committee
Referred to Committee on Agriculture, Chesapeake and Natural Resources
lower
1 primary · 9 co-sponsors
Sponsors
Ask Maddy
·
AI policy assistant
Ask Maddy about HB 2178
Scope: VA
Hi! I can help you understand HB 2178. What would you like to know?
Try one of these
i
Maddy answers using official bill text and legislative records. Always verify before sharing.
Sources cited inline