Grid Connection and Congestion Management Act
The Grid Connection and Congestion Management Act requires Regional Transmission Organizations and Independent System Operators to offer a new type of interconnection service called basic access service for energy-only delivery. This service allows power generators to connect to the grid based on a streamlined evaluation that only checks if the facility can be safely connected, rather than guaranteeing that the power can be delivered to the market without interruptions. Generators accepting this service may face congestion-related curtailment, meaning their output could be reduced during times of high demand, but they are not required to pay for expensive transmission upgrades needed to eliminate those congestion issues. The law mandates that these grid operators update their rules within 180 days and establishes a process for generators to transition to other interconnection services later if they choose.
Bill status
in committee
1 of 4 stages cleared
Introduction
Jul 2026
Committee Review
Floor Vote
President
Introduced Jul 16, 2026
Last action Jul 16, 2026
Floor votes
How they voted
No floor votes recorded yet.
Full legislative history
Actions timeline
Total actions
2
Key actions
0
Committee
1
Jul 16, 2026
Committee
Read twice and referred to the Committee on Energy and Natural Resources.
upper
Jul 16, 2026
Introduced
Introduced in Senate
upper
1 primary · 0 co-sponsors
Sponsors
Role
Legislator
Party
State
District
P
Martin Heinrich
DDemocratic
Ask Maddy
·
AI policy assistant
Ask Maddy about S 5008
Scope: US
Hi! I can help you understand S 5008. What would you like to know?
Try one of these
i
Maddy answers using official bill text and legislative records. Always verify before sharing.
Sources cited inline