A bill to allow for the use of risk-based inspections for in-service breakout tanks.
This bill allows pipeline facility owners and operators to use risk-based inspections instead of fixed schedules for in-service breakout tanks (tanks that temporarily store hazardous liquids during pipeline operations). It requires the Pipeline and Hazardous Materials Safety Administration to update federal regulations (49 CFR §195.432) to formally permit this approach within 60 days of the bill's enactment. The key change shifts inspection requirements from time-based checks to assessments focused on actual risk factors like tank condition or location. This directly affects pipeline operators subject to federal safety rules under Title 49 of the U.S. Code. The bill does not alter safety standards but changes how compliance is demonstrated.
Bill status
in committee
1 of 4 stages cleared
Introduction
Aug 2025
Committee Review
Floor Vote
President
Introduced Aug 1, 2025
Last action Aug 1, 2025
Floor votes
How they voted
No floor votes recorded yet.
Full legislative history
Actions timeline
Total actions
2
Key actions
0
Committee
1
Aug 1, 2025
Committee
Read twice and referred to the Committee on Commerce, Science, and Transportation.
upper
Aug 1, 2025
Introduced
Introduced in Senate
upper
1 primary · 0 co-sponsors
Sponsors
Role
Legislator
Party
State
District
P
John R. Curtis
RRepublican
Ask Maddy
·
AI policy assistant
Ask Maddy about S 2661
Scope: US
Hi! I can help you understand S 2661. What would you like to know?
Try one of these
i
Maddy answers using official bill text and legislative records. Always verify before sharing.
Sources cited inline