HR 9362 United States House · 118th Congress

Reinforcing the Grid Against Extreme Weather Act of 2024

HR 9362, the Reinforcing the Grid Against Extreme Weather Act of 2024, requires the Federal Energy Regulatory Commission (FERC) to establish rules within 24 months for standardizing how electricity transfer capability between neighboring grid regions is calculated and ensuring minimum levels for reliability during extreme weather, cyberattacks, or physical events. Transmission planning entities (like grid operators) must file plans every five years to select and fund projects that meet these minimum transfer capabilities, focusing on benefits like reduced outages, improved resilience, and lower congestion. The bill directly affects grid operators, FERC, and the electricity infrastructure connecting regional power systems across the U.S. It mandates concrete steps to strengthen grid interconnectivity without specifying new emissions targets or funding mechanisms.
Bill status in committee 1 of 4 stages cleared
Introduction
Aug 2024
Committee Review
Floor Vote
President
Introduced Aug 16, 2024 Last action Aug 16, 2024
Floor votes

How they voted

No floor votes recorded yet.
Full legislative history

Actions timeline

Total actions
2
Key actions
0
Committee
1
Aug 16, 2024
Committee
Referred to the House Committee on Energy and Commerce.
lower
Aug 16, 2024
Introduced
Introduced in House
lower
1 primary · 0 co-sponsors

Sponsors

Role
Legislator
Party
State
District
P
Photo of Sean Casten
Sean Casten
DDemocratic
IL
6