Housatonic Wild and Scenic River Act of 2022
Summary
Housatonic Wild and Scenic River Act of 2022 This bill designates specified segments of the Housatonic River in Connecticut as components of the National Wild and Scenic Rivers System. The designation of the river segments must not impact or alter the existing terms of permitting, licensing, or operation of the Falls Village Hydroelectric Generating Station located in Falls Village, Connecticut, or the Bulls Bridge Hydroelectric Generating Station located in New Milford, Connecticut. The designation of the river segments must also not preclude the Federal Energy Regulatory Commission from licensing, relicensing, or otherwise authorizing the operation or continued operation of those facilities. The authority of the Department of the Interior to acquire lands for the river segments shall be limited to acquisition by donation or acquisition with the consent of the owner, and subject to the additional criteria set forth in the Housatonic River Management Plan. No land or interest in land may be acquired for the river segments by condemnation.
Bill status
in committee
1 of 4 stages cleared
Introduction
May 2022
Committee Review
Floor Vote
President
Introduced May 2, 2022
Last action Sep 21, 2022
Floor votes
How they voted
No floor votes recorded yet.
Full legislative history
Actions timeline
Total actions
3
Key actions
1
Committee
2
Sep 21, 2022
Upper · Passed
Committee on Energy and Natural Resources Subcommittee on National Parks. Hearings held.
upper
May 2, 2022
Committee
Read twice and referred to the Committee on Energy and Natural Resources.
upper
May 2, 2022
Introduced
Introduced in Senate
upper
1 primary · 0 co-sponsors
Sponsors
Role
Legislator
Party
State
District
P
Christopher Murphy
DDemocratic
Ask Maddy
·
AI policy assistant
Ask Maddy about S 4122
Scope: US
Hi! I can help you understand S 4122. What would you like to know?
Try one of these
i
Maddy answers using official bill text and legislative records. Always verify before sharing.
Sources cited inline