HF 3298 Minnesota House · 2025-2026 Regular Session

Reimbursement program established for underground petroleum storage tank systems with pressurized single-walled steel piping.

HF 3298 establishes a reimbursement program for owners of underground petroleum storage tank systems to replace outdated pressurized single-walled steel piping. This directly affects property owners and operators of gas stations or similar facilities with these specific piping systems. The bill amends Minnesota Statutes to add a new provision (115C.09, subdivision 3l) allowing reimbursement from the existing petroleum tank release cleanup fund for the cost of replacing this piping. The program covers eligible piping between storage tanks and dispensers, excluding the tanks themselves or other site improvements. This creates a concrete financial mechanism to address a known safety and environmental risk associated with this aging infrastructure.
Bill status signed all 5 stages cleared
Introduction
May 2025
Committee Review
May 2026
House Passage
May 2026
Senate Passage
May 2026
Signed into Law
May 2026
Introduced May 5, 2025 Signed May 26, 2026
Maddy AI version diff · 1 comparison

What changed between versions

Introduction 1st Engrossment · 4 edits · Mar 5, 2026
MODERATE
The bill was updated from its introduction to its first engrossment version, incorporating several substantive changes to expand the reimbursement program for underground petroleum storage tanks. The most significant change is the expansion of eligible costs to include 'related equipment' in addition to piping, and a delay in the program's start date from January 1, 2026, to January 1, 2027. The program's expiration date was also extended from June 30, 2036, to June 30, 2037, providing a longer timeframe for reimbursement claims.
Scope change
The bill's scope was expanded to include reimbursement for related equipment alongside piping, and the applicability timeline was shifted forward by one year.
ELIGIBILITY

Reimbursement eligibility was broadened to cover the cost of replacing both pressurized single-walled steel piping and related equipment, whereas the original text only covered piping.

TIMELINE

The program start date was delayed from January 1, 2026, to January 1, 2027, and the expiration date was extended from June 30, 2036, to June 30, 2037.

REQUIREMENT

The requirement for eligible equipment was clarified to ensure it meets all current applicable federal and state regulations and standards.

FISCAL

The funding limit description was updated to explicitly state that the $4,000,000 annual cap applies to the fund established under section 115C.08 for this specific subdivision.

Floor votes · House May 7, 2026

How they voted

This bill passed the Senate by voice vote (no roll call recorded).
Full legislative history

Actions timeline

Total actions
24
Key actions
6
Committee
3
May 26, 2026
Signed into law
Governor's action Approval 05/26/26
executive
May 26, 2026
Introduced
Secretary of State, Filed 05/26/2026
lower
May 26, 2026
Signed into law
Governor approval 05/26/2026
executive
May 16, 2026
Upper · Passed
Third reading Passed
upper
May 11, 2026
Committee
Referred to Energy, Utilities, Environment, and Climate
upper
May 11, 2026
Introduced
Introduction and first reading
upper
May 11, 2026
Introduced
Received from House
upper
May 7, 2026
Lower · Passed
Bill was passed
lower
Mar 26, 2026
Lower · Passed
Committee report, to adopt
lower
Mar 5, 2026
Lower · Passed
Committee report, to adopt as amended and re-refer to Ways and Means
lower
May 5, 2025
Introduced
Introduction and first reading, referred to Energy Finance and Policy
lower
1 primary · 5 co-sponsors

Sponsors