Electricity: transmission planning and permitting.
Summary
Existing law requires the Public Utilities Commission (PUC) , in consultation with the State Energy Resources Conservation and Development Commission (Energy Commission) , on or before March 31, 2024, to provide transmission-focused guidance to the Independent System Operator about resource portfolios of expected future renewable energy resources and zero-carbon resources, including the allocation of those resources by region based on technical feasibility and commercial interest in each region to allow the Independent System Operator to identify and approve transmission facilities needed to interconnect resources and reliably serve the needs of load centers, as specified . On December 23, 2022, the PUC, Energy Commission, and Independent System Operator entered into a memorandum of understanding related to resource and transmission planning, transmission development and permitting, procurement, and interconnections in order to achieve reliability and policy needs and to coordinate the timely development of resources, resource interconnections, and needed transmission infrastructure. Existing law requires the Energy Commission and PUC, in coordination with the Independent System Operator, every 5 years, to review and update, as necessary, the memorandum of understanding and a related workplan to ensure the memorandum and workplan reflect the coordination that is needed to help meet the state's energy goals. This bill would require those entities to review and update, as necessary, the memorandum every 3 years, rather than every 5 years.
Bill status
failed
1 of 4 stages cleared
Introduction
Feb 2025
Committee Review
Floor Vote
Governor
Introduced Feb 21, 2025
Last action Feb 2, 2026
Maddy AI version diff · 1 comparison
What changed between versions
02/21/25 - Introduced
→
SB836
·
1 edit
MINOR
No substantive policy changes between these two versions. The 'from' version is a plain-text document rendering of SB 836 as introduced, and the 'to' version is an HTML web-page rendering of the same bill text. Both contain identical legislative content: amending Section 25308 of the Public Resources Code to shorten the review cycle for the transmission planning Memorandum of Understanding from every 5 years to every 3 years.
TECHNICAL
The only difference is presentation format: the bill text moved from a plain-text document layout (with line numbers and page headers) to a web-page layout with navigation menus, search fields, and structured headings. The underlying legislative language is unchanged.
Floor votes
How they voted
No floor votes recorded yet.
Full legislative history
Actions timeline
Total actions
11
Key actions
2
Committee
3
May 23, 2025
Upper · Passed
May 23 hearing: Held in committee and under submission.
upper
Apr 22, 2025
Upper · Passed
From committee: Do pass and re-refer to Com. on APPR. (Ayes 14. Noes 2. Page 811.) (April 21). Re-referred to Com. on APPR.
upper
Mar 12, 2025
Committee
Referred to Com. on E., U & C.
upper
Feb 21, 2025
Introduced
Introduced. To Com. on RLS. for assignment. To print.
upper
1 primary · 0 co-sponsors
Sponsors
Role
Legislator
Party
State
District
P
Susan Rubio
DDemocratic
Ask Maddy
·
AI policy assistant
Ask Maddy about SB 836
Scope: CA
Hi! I can help you understand SB 836. What would you like to know?
Try one of these
i
Maddy answers using official bill text and legislative records. Always verify before sharing.
Sources cited inline