SB 797 California Senate · 2025-2026 Regular Session

Electric utility distribution and transmission system facilities: undergrounding and insulation.

Summary
Existing law vests the Public Utilities Commission with regulatory authority over public utilities, including electrical corporations. Under existing law, it is the policy of the state that each electrical corporation continue to operate its electric distribution grid in its service territory and to do so in a safe, reliable, efficient, and cost-effective manner. This bill would require the commission, until January 1, 2031, to form a working group to study the cost of undergrounding and insulating overhead electric utility distribution system facilities or transmission system facilities, compile wildfire mitigation reports of electric utilities, and provide the Legislature, on or before July 1, 2027, with a plan on how to most effectively invest in undergrounding and insulating those facilities or how to otherwise support electrical corporations, as provided.
Bill status failed 1 of 4 stages cleared
Introduction
Feb 2025
Committee Review
Floor Vote
Governor
Introduced Feb 21, 2025 Last action Feb 2, 2026
Maddy AI version diff · 4 comparisons

What changed between versions

04/09/25 - Amended Senate 05/06/25 - Amended Senate · 3 edits · May 6, 2025
MINOR
This amendment to SB 797 is primarily technical and formatting in nature, with minor rewording of the legislative digest for clarity. The most notable potential substantive change is to the state-mandated local program designation, which appears to have been altered from 'yes' to an ambiguous 'yes no,' though this may be a clerical error given that the bill's text still describes a lead agency determination requirement. Section numbering also shows what appears to be a drafting artifact.
TECHNICAL

The legislative digest was reworded from 'electric utility distribution system facilities: and transmission system facilities: undergrounding and insulating. insulation.' to 'Electric utility distribution and transmission system facilities: undergrounding and insulation.' for conciseness.

Section numbering shows a drafting artifact where 'SEC. 2.' was separated onto its own line and 'SECTION 1.' was inserted before the Public Utilities Code section, likely an error since the content remains the same working group provision.

REQUIREMENT

The state-mandated local program designation changed from 'yes' to 'yes no,' which is ambiguous and may be a clerical error. If intentional, it would remove the finding that the bill imposes a state-mandated local program on lead agencies determining CEQA exemption eligibility.

Floor votes

How they voted

No floor votes recorded yet.
Full legislative history

Actions timeline

Total actions
17
Key actions
6
Committee
4
Amendments
4
May 23, 2025
Upper · Passed
May 23 hearing: Held in committee and under submission.
upper
May 6, 2025
Upper · Passed
Read second time and amended. Re-referred to Com. on APPR.
upper
May 5, 2025
Upper · Passed
From committee: Do pass as amended and re-refer to Com. on APPR. (Ayes 13. Noes 1. Page 935.) (April 29).
upper
Apr 23, 2025
Upper · Passed
From committee: Do pass and re-refer to Com. on E., U & C. (Ayes 8. Noes 0. Page 867.) (April 23). Re-referred to Com. on E., U & C.
upper
Apr 9, 2025
Upper · Passed
From committee with author's amendments. Read second time and amended. Re-referred to Com. on E.Q.
upper
Apr 2, 2025
Committee
Re-referred to Coms. on E.Q. and E., U & C.
upper
Mar 26, 2025
Upper · Passed
From committee with author's amendments. Read second time and amended. Re-referred to Com. on RLS.
upper
Mar 12, 2025
Committee
Referred to Com. on RLS.
upper
Feb 21, 2025
Introduced
Introduced. To Com. on RLS. for assignment. To print.
upper
1 primary · 0 co-sponsors

Sponsors

Role
Legislator
Party
State
District
P
Photo of Steve Choi
Steve Choi
RRepublican
CA
37