Geothermal powerplants and projects: certification and environmental review.
What changed between versions
In Section 1.5 (the version operative if SB 254 is enacted first), the minimum capital investment for eligible discretionary manufacturing projects was reduced from $250 million to $100 million over five years, broadening which energy manufacturing facilities can qualify for streamlined environmental review.
In Section 1.5 paragraph (6)(B), the parenthetical reference to Senate Bill 867 and the November 5, 2024 statewide general election was removed from the description of the Safe Drinking Water, Wildfire Prevention, Drought Preparedness, and Clean Air Bond Act of 2024, simplifying the language now that the bond has been enacted.
The coauthor credit for Assembly Member Papan was removed in the enrolled version, and the legislative counsel's digest no longer includes the phrase 'as amended.'