AB 2476 California Assembly · 2025-2026 Regular Session

Electricity: integrated resource plans: Department of Water Resources: procurement.

Summary
Existing law requires the Public Utilities Commission to adopt a process for each load-serving entity, as defined, to file an integrated resource plan, adopt a schedule for periodic updates to the plan, and ensure each load-serving entity takes specified actions, as specified. Existing law requires the commission to determine if there is a need for the procurement of eligible energy resources, as described, requires the commission to specify the eligible energy resources that should be procured to meet that need, and authorizes the commission, within 6 months of making that determination, to request the Department of Water Resources to procure those specified resources that meet the portfolio of resources, as specified. Existing law authorizes the department to procure those resources pursuant to that request only before January 1, 2035, as provided. Existing law authorizes the department to procure resources from a pump hydroelectric facility pursuant to these provisions if the pump hydroelectric facility does not exceed 500 megawatts and was directly appropriated funding by the state before January 1, 2023. This bill would eliminate the requirement that a pump hydroelectric facility be directly appropriated funding by the state before January 1, 2023, in order for the department to procure resources from the facility. This bill would incorporate additional changes to Section 454.52 of the Public Utilities Code proposed by AB 2369 to be operative only if this bill and AB 2369 are enacted and this bill is enacted last.
Bill status passed both 4 of 5 stages cleared
Introduction
Feb 2026
Committee Review
Aug 2026
Assembly Passage
May 2026
Senate Passage
Aug 2026
Governor
Introduced Feb 20, 2026 Last action Aug 27, 2026
Maddy AI version diff · 3 comparisons

What changed between versions

08/20/26 - Amended Senate AB2476 · 2 edits
MINOR
The final version of AB 2476 removes a requirement that pump hydroelectric facilities must have received direct state-appropriated funding before January 1, 2023 in order to be eligible for procurement by the Department of Water Resources. This broadens which pump hydroelectric facilities (under 500 MW) DWR can contract with. All other changes between versions are formatting and presentation only, converting from a traditional legislative document layout to a web-based format.
ELIGIBILITY

Removed the requirement that a pump hydroelectric facility must have been directly appropriated funding by the state before January 1, 2023. Now any pump hydroelectric facility not exceeding 500 megawatts is eligible for DWR procurement, regardless of its funding history.

TECHNICAL

Extensive formatting changes converting the document from a traditional legislative layout (with line numbers, page headers, and column formatting) to a clean web-based presentation with navigation elements. No substantive policy content was changed beyond the pump hydroelectric eligibility modification.

Floor votes · Senate Aug 17, 2026 · Assembly May 14, 2026

How they voted

400
Passed
Total votes 40
Aug 17, 2026
D Democratic30
30 Yea
100% Yea
R Republican10
10 Yea
100% Yea
Vote distribution
All Yea All Nay Mixed No data
Full legislative history

Actions timeline

Total actions
25
Key actions
11
Committee
8
Amendments
4
Aug 27, 2026
Introduced
In Assembly. Concurrence in Senate amendments pending.
lower
Aug 26, 2026
Upper · Passed
Read third time. Passed. Ordered to the Assembly. (Ayes 40. Noes 0.).
upper
Aug 20, 2026
Upper · Passed
Read third time and amended. Ordered to second reading.
upper
Aug 20, 2026
Upper · Passed
Action rescinded whereby the bill was read third time, passed, and to Assembly.
upper
Aug 17, 2026
Lower · Passed
In Assembly. Ordered to Engrossing and Enrolling.
lower
Aug 17, 2026
Upper · Passed
Read third time. Passed. Ordered to the Assembly. (Ayes 39. Noes 0.).
upper
Jun 22, 2026
Upper · Passed
From committee: Be ordered to second reading pursuant to Senate Rule 28.8.
upper
Jun 9, 2026
Upper · Passed
From committee: Do pass and re-refer to Com. on APPR. (Ayes 16. Noes 0.) (June 8). Re-referred to Com. on APPR.
upper
May 27, 2026
Committee
Referred to Com. on E., U & C.
upper
May 14, 2026
Lower · Passed
Read third time. Passed. Ordered to the Senate. (Ayes 77. Noes 0. Page 5056.)
lower
May 6, 2026
Lower · Passed
From committee: Do pass. To Consent Calendar. (Ayes 14. Noes 0.) (May 6).
lower
Apr 28, 2026
Committee
Re-referred to Com. on APPR.
lower
Apr 27, 2026
Lower · Passed
Read second time and amended.
lower
Apr 23, 2026
Introduced
From committee: Amend, and do pass as amended and re-refer to Com. on APPR. with recommendation: To Consent Calendar. (Ayes 18. Noes 0.) (April 22).
lower
Mar 9, 2026
Committee
Referred to Com. on U. & E.
lower
Feb 21, 2026
Lower · Passed
From printer. May be heard in committee March 23.
lower
1 primary · 0 co-sponsors

Sponsors

Role
Legislator
Party
State
District
P
Photo of Stan Ellis
Stan Ellis
RRepublican
CA
32