SB 1386 California Senate · 2019-2020 Regular Session

Local government: assessments, fees, and charges: water: hydrants.

Summary
The California Constitution specifies various requirements with respect to the levying of assessments and property-related fees and charges by a local agency, including requiring that the local agency provide public notice and a majority protest procedure in the case of assessments and submit property-related fees and charges for approval by property owners subject to the fee or charge or the electorate residing in the affected area following a public hearing. Existing law, known as the Proposition 218 Omnibus Implementation Act, prescribes specific procedures and parameters for local jurisdictions to comply with these requirements and, among other things, authorizes an agency providing water, wastewater, sewer, or refuse collection services to adopt a schedule of fees or charges authorizing automatic adjustments that pass through increases in wholesale charges for water, sewage treatment, or wastewater treatment or adjustments for inflation under certain circumstances. Existing law defines, among other terms, the term "water" for these purposes to mean any system of public improvements intended to provide for the production, storage, supply, treatment, or distribution of water from any source. This bill would specify that hydrants, as defined, are part of the system of public improvements included in the definition of "water" for purposes of the Proposition 218 Omnibus Implementation Act. The bill would specify that the fees or charges for property-related water service imposed or increased, as specified, may include the costs to construct, maintain, repair, or replace hydrants as needed or consistent with fire codes and industry standards, and may include the cost of water distributed through hydrants. The bill would also authorize the fees or charges for the aspects of water service related to hydrants and the water distributed through them to be fixed and collected as a separate fee or charge, or included in the other water rates and charges fixed and collected by a public agency, as specified.
Bill status signed all 5 stages cleared
Introduction
Feb 2020
Committee Review
Aug 2020
Senate Passage
Jun 2020
Assembly Passage
Aug 2020
Signed into Law
Sep 2020
Introduced Feb 21, 2020 Signed Sep 28, 2020
Floor votes · Senate Jun 11, 2020 · Assembly Aug 30, 2020

How they voted

340
Passed · 1 other
Total votes 35
Jun 11, 2020
D Democratic26
25 Yea 1
96% Yea
R Republican9
9 Yea
100% Yea
Vote distribution
All Yea All Nay Mixed No data
Full legislative history

Actions timeline

Total actions
25
Key actions
6
Committee
5
Amendments
2
Sep 28, 2020
Signed into law
Approved by the Governor.
legislature
Aug 30, 2020
Upper · Passed
Assembly amendments concurred in. (Ayes 39. Noes 0.) Ordered to engrossing and enrolling.
upper
Aug 30, 2020
Introduced
In Senate. Concurrence in Assembly amendments pending.
upper
Aug 30, 2020
Lower · Passed
Read third time. Passed. (Ayes 75. Noes 0. Page 5280.) Ordered to the Senate.
lower
Aug 11, 2020
Lower · Passed
From committee: Do pass. Ordered to consent calendar. (Ayes 8. Noes 0.) (August 11).
lower
Jun 18, 2020
Committee
Referred to Com. on L. GOV.
lower
Jun 11, 2020
Upper · Passed
Read third time. Passed. (Ayes 39. Noes 0. Page 3688.) Ordered to the Assembly.
upper
May 21, 2020
Upper · Passed
From committee: Do pass. (Ayes 7. Noes 0. Page 3576.) (May 21).
upper
May 11, 2020
Committee
Re-referred to Com. on GOV. & F.
upper
Mar 12, 2020
Committee
Referred to Com. on RLS.
upper
Feb 21, 2020
Introduced
Introduced. To Com. on RLS. for assignment. To print.
upper
1 primary · 5 co-sponsors

Sponsors