AB 1637 California Assembly · 2015-2016 Regular Session

Energy: greenhouse gas reduction.

Summary
(1) Under existing law, the Public Utilities Commission (PUC) has regulatory authority over public utilities. Existing law requires the PUC to require the administration, until January 1, 2021, of a self-generation incentive program for distributed generation resources and energy storage technologies. Existing law authorizes the PUC, in consultation with the State Energy Resources Conservation and Development Commission, to authorize the annual collection of not more than the amount authorized for the program in the 2008 calendar year. This bill would increase the maximum annual collection the PUC may authorize for the program to double the amount authorized for the program in the 2008 calendar year. (2) Existing law requires an electrical corporation to file with the PUC a standard tariff providing for net energy meeting for eligible fuel cell customer-generators and make the tariff available, on a first-come-first-served basis, until the total cumulative rated generating capacity of the eligible fuel cell electrical generating facilities receiving service pursuant to the tariff reaches a level equal to the electrical corporation's proportionate share of a statewide limitation of 500 megawatts cumulative rated generation capacity served (program cap) . Existing law requires the eligible fuel cell customer-generator to meet certain requirements, including requirements that the customer-generator uses: (A) a fuel cell electrical generation facility with a capacity of not more than one megawatt and (B) technology the PUC has determined will achieve certain reductions in emissions of greenhouse gases. Existing law provides that fuel cell electrical generation facilities are not eligible for the tariff unless the facilities commence operation prior to January 1, 2017. This bill would increase the program cap by authorizing 500 megawatts in addition to the total installed capacity as of January 1, 2017. The bill would increase to 5 megawatts the maximum amount of generation capacity for a fuel cell electrical generation facility in the program. The bill would require, by March 31, 2017, the State Air Resources Board, in consultation with the Energy Commission, to establish a schedule of annual greenhouse gas emissions reduction standards, as specified, for fuel cell electrical generation resources and would require the PUC to determine if the technology used by the eligible fuel cell customer-generator will achieve those standards. The bill would require the fuel cell electrical generation resource to comply with emission standards adopted by the State Air Resources Board under the distributed generation certification program. This bill would provide that fuel cell electrical generation facilities are not eligible for the tariff unless the facilities commence operation on or before December 31, 2021.
Bill status signed all 5 stages cleared
Introduction
Jan 2016
Committee Review
Aug 2016
Assembly Passage
Apr 2016
Senate Passage
Aug 2016
Signed into Law
Sep 2016
Introduced Jan 7, 2016 Signed Sep 26, 2016
Floor votes · Senate Aug 23, 2016 · Assembly Apr 28, 2016

How they voted

209
Passed · 4 other
Total votes 33
Aug 23, 2016
D Democratic23
20 Yea 3
86% Yea
R Republican10
9 Nay 1
90% Nay
Vote distribution
All Yea All Nay Mixed No data
Full legislative history

Actions timeline

Total actions
32
Key actions
7
Committee
10
Amendments
2
Sep 26, 2016
Signed into law
Approved by the Governor.
legislature
Aug 31, 2016
Lower · Passed
Senate amendments concurred in. To Engrossing and Enrolling. (Ayes 47. Noes 27. Page 6552.).
lower
Aug 31, 2016
Lower · Passed
From committee: That the Senate amendments be concurred in. (Ayes 16. Noes 0.) (August 31).
lower
Aug 31, 2016
Committee
From committee: That the Senate amendments be concurred in, but first be re-referred to Com. on APPR. (Ayes 5. Noes 3.) (August 30). Re-referred to Com. on APPR.
lower
Aug 25, 2016
Committee
Re-referred to Coms. on NAT. RES. and APPR. pursuant to Assembly Rule 77.2.
lower
Aug 23, 2016
Senate · Passed
Senate Vote: pass (20-9-4)
senate
Aug 23, 2016
Lower · Passed
Measure version as amended on August 18 corrected.
lower
Aug 23, 2016
Introduced
In Assembly. Concurrence in Senate amendments pending. May be considered on or after August 25 pursuant to Assembly Rule 77.
lower
Aug 18, 2016
Committee
From committee chair, with author's amendments: Amend, and re-refer to committee. Read second time, amended, and re-referred to Com. on RLS.
upper
Aug 16, 2016
Committee
Re-referred to Com. on RLS.
upper
May 5, 2016
Committee
Referred to Com. on B. & F.R.
upper
Apr 28, 2016
Assembly · Passed
Assembly Vote: pass (44-24-3)
assembly
Apr 18, 2016
Committee
Re-referred to Com. on BUDGET.
lower
Feb 1, 2016
Committee
Referred to Com. on BUDGET.
lower
Jan 8, 2016
Lower · Passed
From printer. May be heard in committee February 7.
lower
1 primary · 4 co-sponsors

Sponsors