SB 1125 Wisconsin Senate · 2025-2026 Regular Session

Relating to: priorities for siting certain electric transmission facilities.

This bill establishes priority rules for locating specific types of high-voltage electric transmission infrastructure, including mega transmission systems, consolidated utility corridors, and high-voltage direct current systems. It directs that these facilities be sited within existing high-voltage transmission line rights-of-way or along the corridors of interstate highways, U.S. numbered highways, state trunk highways, or railroad rights-of-way. The legislation defines a mega transmission system as a high-voltage line designed to operate at more than 400 kilovolts and renumbers an existing statute section to accommodate this new provision.
Bill status failed 1 of 4 stages cleared
Introduction
Mar 2026
Committee Review
Floor Vote
Governor
Introduced Mar 19, 2026 Last action Apr 1, 2026
Floor votes

How they voted

No floor votes recorded yet.
Full legislative history

Actions timeline

Total actions
4
Key actions
0
Committee
0
Mar 19, 2026
Introduced
Introduced by Senator Pfaff; cosponsored by Representative Johnson
upper
1 primary · 0 co-sponsors

Sponsors

Role
Legislator
Party
State
District
P
Photo of Brad Pfaff
Brad Pfaff
DDemocratic
WI
32