Relating to the installation of a treatment system by certain public drinking water supply systems.
What changed between versions
Added requirement that the treatment system applies to public drinking water systems serving fewer than 100 connections
Changed the trigger conditions for requiring treatment systems to include repeated exceedance of maximum contaminant levels and substantiated water quality complaints
Added a new condition requiring that the treatment system can be installed at a reasonable cost
Removed the previous requirement that the commission must have previously recommended a filtration system
Changed the complaint timeframe from 'previous year' to 'preceding 12 months' with specific conditions about determining need for additional treatment measures
Clarified that water quality complaints regarding distribution system issues not related to underground sources should not be counted