HB 199 Texas House · 89th Legislature, 1st Called Session (2025)

Relating to the interconnection of the ERCOT power grid to grids outside the ERCOT power region.

HB 199 allows Texas utilities (including transmission companies, municipal utilities, and electric cooperatives) to build infrastructure connecting the ERCOT power grid to outside power systems, enabling them to purchase wholesale electricity from other regions. The law creates a process requiring the Public Utility Commission to approve interconnection applications and mandates the Commission to identify potential connection points by September 1, 2027. It applies to both synchronous (direct) and non-synchronous (indirect) grid connections, with federal approval requirements for certain interconnections. The bill does not change electricity rates, generation policies, or existing grid operations - it only establishes a legal framework for future interconnection.
Bill status introduced 1 of 4 stages cleared
Introduction
Jul 2025
Committee Review
Floor Vote
Governor
Introduced Jul 24, 2025 Last action Jul 24, 2025
Floor votes

How they voted

No floor votes recorded yet.
Full legislative history

Actions timeline

Total actions
1
Key actions
0
Committee
0
1 primary · 0 co-sponsors

Sponsors

Role
Legislator
Party
State
District
P
Photo of Ron Reynolds
Ron Reynolds
DDemocratic
TX
27