SB 1285 Oklahoma Senate · 2026 Regular Session

Public Facilities Act; establishing certain requirements for certain construction. Effective date.

SB 1285 requires all new construction by Oklahoma state-funded entities (like agencies, universities, and career centers) to meet strict energy efficiency standards for heating, cooling, and building systems. It mandates minimum performance levels for heating systems (e.g., 90% efficiency for gas, banning electric resistance as primary heat), prioritizes geothermal systems, and requires life-cycle cost analysis over 25 years to select the most efficient options. The bill also requires integrated building control systems to monitor energy use and gives preference to licensed Oklahoma vendors and locally made HVAC equipment. These changes aim to reduce energy costs, promote renewable energy integration, and ensure state buildings meet verified efficiency benchmarks.
Bill status in committee 1 of 4 stages cleared
Introduction
Feb 2026
Committee Review
Floor Vote
Governor
Introduced Feb 2, 2026 Last action Feb 17, 2026
Maddy AI version diff · 3 comparisons

What changed between versions

SB1285 (2-25-26) (COLEMAN) FA1.PDF Floor (Senate) · 7 edits
MODERATE
The bill was amended to replace a committee version with a floor version that establishes comprehensive energy and environmental standards for state building construction and renovations. The changes add detailed technical requirements for HVAC systems, define key terms like 'licensed vendor' and 'state-funded entity', and mandate life-cycle cost analysis for building projects.
Scope change
The bill now applies to new construction and large-scale renovations of state buildings, specifically targeting state-funded entities while explicitly excluding public school districts and charter schools from certain requirements.
DEFINITION

Added clear definitions for 'large-scale renovation', 'licensed vendor', 'new construction', and 'state-funded entity' to clarify which projects and contractors are covered.

REQUIREMENT

Established specific efficiency standards for HVAC systems including minimum fuel utilization efficiency for gas systems, performance metrics for heat pumps, and requirements for ground source systems.

Mandated life-cycle cost analysis over a 25-year period to determine optimal building performance and prioritize systems with lowest total costs.

Required HVAC control systems that can monitor and optimize heating, ventilation, and air conditioning performance in all new state buildings.

Required post-occupancy measurement and verification to validate that building systems perform according to design intent and operational needs.

ELIGIBILITY

Established preference for licensed vendors who hold current state licenses, registrations, or certifications necessary to perform the work.

TECHNICAL

Removed committee amendment language regarding deleting the word 'licensed' and inserting additional licensing requirements, as these were superseded by the new comprehensive definitions and standards.

Floor votes

How they voted

No floor votes recorded yet.
Full legislative history

Actions timeline

Total actions
6
Key actions
1
Committee
1
Feb 12, 2026
Upper · Passed
Reported Do Pass, amended by committee substitute Business and Insurance committee; CR filed
upper
Feb 2, 2026
Introduced
First Reading
upper
2 primary · 0 co-sponsors

Sponsors