HB 1374 Oklahoma House · 2025 Regular Session

Electric vehicles; directing establishment of minimum safety standards for charging stations; requiring reporting; directing rule promulgation; effective date.

House Bill 1374 directs the Corporation Commission to establish minimum fire safety standards for electric vehicle (EV) charging stations located in multistory buildings. It requires operators of these stations to annually attest their compliance with specific safety measures. Key provisions include mandating that charging stations be on the ground floor, within 25 feet of an entry, and equipped with emergency call boxes, fire extinguishers, sufficient lighting, and continuous video surveillance. The bill allows the Commission to set rules for annual reporting, third-party inspections, and fees, with penalties for non-compliance. This legislation directly affects charging station operators who provide EV charging in multistory structures.
Bill status passed 3 of 5 stages cleared
Introduction
Feb 2025
Committee Review
Apr 2025
House Passage
Mar 2025
Senate Passage
Governor
Introduced Feb 3, 2025 Last action May 6, 2025
Maddy AI version diff · 6 comparisons

What changed between versions

Floor (House) Floor (Senate) · 6 edits
MODERATE
The bill was rewritten from the House to Senate floor version, shifting focus from broad public utility definitions to specific electric vehicle charging station safety standards. The Senate version adds detailed fire safety requirements for charging stations in multistory buildings, including location restrictions, emergency equipment, and surveillance, while removing the House's provisions about green hydrogen and natural gas usage requirements.
Scope change
The bill's scope narrowed from general public utility regulation to specifically targeting electric vehicle charging station safety in multistory buildings, removing broader utility definitions and green hydrogen provisions.
REQUIREMENT

Added specific fire safety standards requiring charging stations in multistory buildings to comply with NEC and NFPA codes, be located on ground floors, and be positioned no more than 25 feet from entry points.

Added mandatory installation of emergency call boxes, fire extinguishers, lighting, fire alarm systems, video surveillance, and emergency contact designation for charging stations.

Removed the House version's requirement that projects utilize a natural gas component in their power generation capacity.

Added requirement for charging station operators to file annual compliance reports with the Corporation Commission.

DEFINITION

Removed the House version's detailed definition of 'public utility' and provisions about green hydrogen electricity production.

ENFORCEMENT

Changed effective date from July 1, 2025 (House) to November 1, 2025 (Senate), and added administrative penalties of up to $500 per day per violation for non-compliance.

Floor votes

How they voted

This bill passed the House by voice vote (no roll call recorded).
Full legislative history

Actions timeline

Total actions
21
Key actions
6
Committee
5
Amendments
1
Apr 24, 2025
Upper · Passed
Reported Do Pass, amended by committee substitute Energy committee; CR filed
upper
Mar 27, 2025
Introduced
First Reading
upper
Mar 27, 2025
Lower · Passed
Engrossed, signed, to Senate
lower
Mar 26, 2025
Committee
Referred for engrossment
lower
Mar 26, 2025
Lower · Passed
Third Reading, Measure and Emergency passed: Ayes: 86 Nays: 0
lower
Mar 26, 2025
Lower · Passed
Amended
lower
Mar 5, 2025
Lower · Passed
CR; Do Pass, amended by committee substitute Energy and Natural Resources Oversight Committee
lower
Feb 4, 2025
Lower · Passed
Policy recommendation to the Energy and Natural Resources Oversight committee; Do Pass Utilities
lower
Feb 4, 2025
Committee
Referred to Utilities
lower
Feb 3, 2025
Introduced
First Reading
lower
2 primary · 0 co-sponsors

Sponsors