Electric vehicles; directing establishment of minimum safety standards for charging stations; requiring reporting; directing rule promulgation; effective date.
What changed between versions
Added specific fire safety standards requiring charging stations in multistory buildings to comply with NEC and NFPA codes, be located on ground floors, and be positioned no more than 25 feet from entry points.
Added mandatory installation of emergency call boxes, fire extinguishers, lighting, fire alarm systems, video surveillance, and emergency contact designation for charging stations.
Removed the House version's requirement that projects utilize a natural gas component in their power generation capacity.
Added requirement for charging station operators to file annual compliance reports with the Corporation Commission.
Removed the House version's detailed definition of 'public utility' and provisions about green hydrogen electricity production.
Changed effective date from July 1, 2025 (House) to November 1, 2025 (Senate), and added administrative penalties of up to $500 per day per violation for non-compliance.