HB 849 North Carolina House · 2025-2026 Session

Utility Forced Relocation Expenses.

HB 849 would require state, city, or public authorities to pay for relocating utility infrastructure (such as power lines, fiber optic cables, and wireless facilities) when relocation is mandated for federally funded highway projects. The state must cover these costs after deducting any increase in the facility's value or salvage value from the old infrastructure. The bill also mandates that cities reimburse utility companies for relocation expenses within their rights-of-way, though this requirement does not apply to cities with fewer than 5,000 residents unless the project is federally funded.
Bill status in committee 1 of 4 stages cleared
Introduction
Apr 2025
Committee Review
Floor Vote
Governor
Introduced Apr 9, 2025 Last action Apr 10, 2025
Maddy AI version diff · 1 comparison

What changed between versions

Filed Edition 1 · 4 edits
MODERATE
The bill was reformatted from a filed version to an official edition with updated sponsor information and committee referrals. The substantive policy content regarding utility relocation expenses and reimbursement requirements remains unchanged, with only minor formatting adjustments and line number reorganization.
Scope change
No substantive scope changes; the bill's applicability to cities, public authorities, and utility companies remains the same.
TECHNICAL

Updated sponsor list to include Representatives Miller, Pyrtle, Setzer, and Huneycutt as primary sponsors with a reference to the General Assembly website for the complete list.

Added committee referral information directing the bill to Energy and Public Utilities, State and Local Government, Rules, Calendar, and Operations of the House.

Reformatted document header and page numbering from filed version to official edition format with bill number H849-v-1.

Removed draft identifier DRH40434-MW-87 and replaced with official version identifier H849-v-1.

Floor votes

How they voted

No floor votes recorded yet.
Full legislative history

Actions timeline

Total actions
3
Key actions
0
Committee
1
Apr 10, 2025
Committee
Ref to the Com on Energy and Public Utilities, if favorable, State and Local Government, if favorable, Rules, Calendar, and Operations of the House
lower
Apr 9, 2025
Introduced
Filed
lower
3 primary · 3 co-sponsors

Sponsors