Early Intervention School Attendance Pilot.
What changed between versions
Removed the specific list of primary sponsors (Representatives Rhyne, Paré, Schietzelt, and Cotham) and the referral status details from the header.
Modified school selection criteria to require the Department to consider technical readiness, staffing capacity, and implementation timelines alongside absenteeism rates.
Added a new requirement that program implementation must align with the technical architecture of the selected solution and integrate with a single student information system.
Expanded the list of required reporting metrics to include improved student engagement, attendance consistency, and operational efficiencies for school staff.
Clarified that funds can be allocated directly to the selected public school unit for that unit or its schools to contract with the vendor.