Requires certain state owned and operated parking facilities to install and maintain charging stations for plug-in electric vehicles
What changed between versions
Replaced the rigid requirement to install chargers for 'plug-in electric vehicles' with a flexible option allowing facilities to meet requirements via a percentage of spaces or a 'power-based allocation method' (total kilowatt capacity).
Removed the specific mandate requiring chargers to support a minimum of forty amperes and two hundred eight volts.
Removed the specific thresholds requiring 10% or 20% installation based on facility size (50-200 spaces vs. over 200 spaces), replacing them with a single rule for facilities with 50 or more spaces.
Added new definitions for 'electric vehicle ready infrastructure' and 'power-based allocation method' to clarify compliance options.
Added a requirement for the Office of General Services to create new rules and regulations within one year to establish guidelines for the power-based allocation method.
Changed the effective date of the act from the first of April following enactment to immediate effect.