A 803 New Jersey General Assembly · 2026-2027 Regular Session

Authorizes construction, installation, and operation of certain energy project components on preserved farmland.

This bill authorizes the construction of energy transmission and distribution infrastructure (like power lines and equipment) on preserved farmland, which is land protected by conservation easements. It requires landowner approval, limits installations to a 50-foot right-of-way along the farm's edge, and mandates specific installation methods (e.g., underground trenches deeper than 3 feet) to minimize disruption to farming. Projects not meeting these conditions must seek committee approval, balancing agricultural use with state energy needs. The bill was enacted as P.L.2025, c.390, after being introduced and withdrawn in 2026.
Bill status died 1 of 4 stages cleared
Introduction
Jan 2026
Committee Review
Floor Vote
Governor
Introduced Jan 13, 2026 Last action Jan 13, 2026
Floor votes

How they voted

No floor votes recorded yet.
Full legislative history

Actions timeline

Total actions
2
Key actions
0
Committee
0
Jan 13, 2026
Introduced
Introduced, Referred to Assembly Commerce and Economic Development Committee
lower
2 primary · 0 co-sponsors

Sponsors