A 3383 New Jersey General Assembly · 2026-2027 Regular Session

Requires paint producers to implement or participate in paint stewardship program.

New Jersey's bill A 3383, the "Architectural Paint Stewardship Act," requires paint producers (manufacturers selling interior/exterior architectural paint in 5-gallon containers or smaller) to create or join a paint stewardship program. The program must collect, reuse, recycle, or responsibly dispose of leftover paint from consumers (post-consumer paint), eliminating costs for local governments. Key mechanisms include producers funding the program through a fee added to paint prices, establishing statewide collection sites (ensuring 90% of residents are within 15 miles of a site), and prioritizing reuse/recycling per federal waste management guidelines. This directly affects paint producers and retailers, shifting disposal responsibility from municipalities to the industry.
Bill status in committee 1 of 4 stages cleared
Introduction
Jan 2026
Committee Review
Floor Vote
Governor
Introduced Jan 13, 2026 Last action Mar 16, 2026
Maddy AI version diff · 1 comparison

What changed between versions

Technical Review Of Prefiled Bill Introduced · 3 edits · Jan 13, 2026
MINOR
This is a procedural transition from the technical review stage to the introduced stage of Assembly Bill 3383. The bill's operative text appears unchanged; the main modifications are administrative: removal of a co-sponsor designation, updating the status line, and adding a detailed explanatory STATEMENT section summarizing the bill's provisions on architectural paint stewardship.
TECHNICAL

Co-sponsor designation for Assemblyman Sampson was removed from the bill header.

Bill version designation changed from 'A3383 TR' (Technical Review) to 'A3383', and the status line changed from 'As reported by the Assembly Environment and Solid Waste Committee with technical review' to 'Introduced Pending Technical Review by Legislative Counsel.'

A STATEMENT section was appended to the bill providing a plain-language summary of all major provisions, including the paint stewardship program requirements, funding mechanism (paint stewardship assessment), DEP approval process, sales prohibition with 18-month delay, civil penalties up to $500 per violation (capped at $10,000 per calendar year), and antitrust liability protections.

Floor votes

How they voted

No floor votes recorded yet.
Full legislative history

Actions timeline

Total actions
2
Key actions
0
Committee
1
Mar 16, 2026
Committee
Reported and Referred to Assembly Appropriations Committee
lower
Jan 13, 2026
Introduced
Introduced, Referred to Assembly Environment and Solid Waste Committee
lower
2 primary · 0 co-sponsors

Sponsors