SB 502 Nevada Senate · 2025 Regular Session

Authorizes and provides funding for certain projects of capital improvement. (BDR S-1233)

SB 502 allocates $99.5 million from the State General Fund and $9.8 million from the State Highway Fund to fund specific capital improvement projects across Nevada state agencies for the 2025-2027 biennium. It directly affects departments including Corrections (e.g., facility maintenance, housing unit upgrades), Human Services (facility maintenance), and the Department of Administration (HVAC, ADA, and safety upgrades). The bill provides funding for 23 specific projects, such as HVAC renovations, ADA compliance, fire safety systems, and building maintenance, all drawn from the existing executive budget. All funds must be spent by September 2029 or reverted to the respective funds. The bill is purely funding-based, authorizing existing budgeted projects without creating new policies.
Bill status signed all 5 stages cleared
Introduction
May 2025
Committee Review
May 2025
Senate Passage
Jun 2025
Assembly Passage
Jun 2025
Signed into Law
Jun 2025
Introduced May 19, 2025 Signed Jun 10, 2025
Maddy AI version diff · 5 comparisons

What changed between versions

Reprint 4 As Enrolled · 4 edits · Jun 10, 2025
MODERATE
The bill was finalized as enacted law, removing procedural notes about committee amendments and replacing the draft summary with the full legal text. The core funding amounts and project descriptions for capital improvements across state departments remain substantively unchanged from the previous version.
Scope change
The bill's scope and applicability remain the same; it authorizes specific capital improvement projects for state departments using funds from the State General Fund and State Highway Fund.
TECHNICAL

Removed procedural headers and footers indicating the bill was a reprint with a receded amendment, as the bill is now enacted.

Deleted the draft 'Summary' and 'Fiscal Note' sections, which are replaced by the full statutory language in the enacted version.

Replaced the draft explanatory text with the formal 'Enacted as Follows' legal language required for final legislation.

FISCAL

All specific dollar amounts allocated to projects (e.g., $99,514,255 for the State General Fund) and project descriptions remain identical to the previous version.

Floor votes · Assembly Jun 1, 2025

How they voted

This bill passed the Senate by voice vote (no roll call recorded).
Full legislative history

Actions timeline

Total actions
17
Key actions
7
Committee
2
Amendments
1
Jun 10, 2025
Signed into law
Approved by the Governor.
executive
Jun 4, 2025
Upper · Passed
From printer. To re-engrossment. Re-engrossed. Fourth reprint. To enrollment.
upper
Jun 2, 2025
Upper · Passed
From printer. To reengrossment. Reengrossed. Third reprint. To Senate. In Senate. Assembly Amendment No. 959 concurred in. Assembly Amendment No. 979 not concurred in. To Assembly. In Assembly. Assembly Amendment No. 979 receded from. To Senate. In Senate.
upper
Jun 1, 2025
Upper · Passed
Taken from Chief Clerk's desk. Placed on General File. Read third time. Amended. (Amend. Nos. 959 and 979.) Dispensed with reprinting. Read third time. Passed, as amended. Title approved. (Yeas: 38, Nays: 4.) To printer.
upper
May 28, 2025
Introduced
From printer. To engrossment. Engrossed. First reprint. Action of adoption of Amendment No. 852 rescinded. To printer.
upper
May 22, 2025
Upper · Passed
From committee: Do pass. Placed on Second Reading File. Read second time.
upper
May 21, 2025
Upper · Passed
Read third time. Passed. Title approved. (Yeas: 17, Nays: 4.) To Assembly. In Assembly. Read first time. Referred to Committee on Ways and Means. To committee.
upper
May 20, 2025
Upper · Passed
From printer. To committee. From committee: Do pass. Placed on Second Reading File. Read second time.
upper
0 primary · 0 co-sponsors

Sponsors

No sponsor information available.