SB 931 Michigan Senate · 2025-2026 Regular Session

Public utilities: electric utilities; new electronic transmission infrastructure; require to use existing rights-of-way. Amends sec. 7 of 1995 PA 30 (MCL 460.567).

Senate Bill 931 requires large electric utilities in Michigan to submit detailed applications to the state commission before building new major transmission lines. The bill mandates that these applications include specific information, such as proposed routes, cost estimates, and an evaluation of how the project could use existing utility corridors or share space with current infrastructure. By emphasizing the consideration of opportunities to parallel with existing rights-of-way, the legislation aims to streamline the approval process for new power lines while encouraging the use of available land. This measure directly affects electric utilities with 50,000 or more residential customers in the state.
Bill status in committee 1 of 4 stages cleared
Introduction
Apr 2026
Committee Review
Floor Vote
Governor
Introduced Apr 23, 2026 Last action Apr 23, 2026
Floor votes

How they voted

No floor votes recorded yet.
Full legislative history

Actions timeline

Total actions
2
Key actions
0
Committee
1
Apr 23, 2026
Committee
REFERRED TO COMMITTEE ON ENERGY AND ENVIRONMENT
upper
Apr 23, 2026
Introduced
INTRODUCED BY SENATOR SAM SINGH
upper
1 primary · 1 co-sponsor

Sponsors