HD 6290 Massachusetts House · 194th Legislature (2025-2026)

An Act establishing a temporary moratorium on large scale photovoltaic installations and battery energy storage systems (BESS) in the town of Becket

This bill authorizes the town of Becket to place a six-month pause on approving new large-scale solar power projects and battery storage systems. During this time, the town will conduct a study to review zoning rules and determine how to regulate these installations while protecting local ecological resources. The temporary halt applies to all large-scale projects except for small battery systems used as accessories to individual homes. This measure gives the town planning staff time to analyze the issue before making permanent changes to local zoning laws.
Bill status Introduction 0 of 4 stages cleared
Introduction
Committee Review
Floor Vote
Governor
Floor votes

How they voted

No floor votes recorded yet.
Full legislative history

Actions timeline

No actions recorded for this bill.
0 primary · 1 co-sponsor

Sponsors

No sponsor information available.