WATER/WATERWAYS: Provides relative to construction of bulkheads on certain water bodies in St. Tammany Parish. (gov sig)
SB 145 removes restrictions on where bulkheads (shoreline structures) can be built on certain water bodies in St. Tammany Parish. It specifically eliminates previous requirements that limited construction to specific locations like the Tchefuncte River or its distributaries. The bill directly affects property owners and developers in St. Tammany Parish seeking to build or modify bulkheads along designated waterways. This change allows for more flexible placement of bulkheads on those water bodies without the prior location-specific constraints.
Bill status
signed
all 5 stages cleared
Introduction
Apr 2025
Committee Review
May 2025
Senate Passage
Apr 2025
House Passage
Jun 2025
Signed into Law
Jun 2025
Introduced Apr 4, 2025
Signed Jun 8, 2025
Maddy AI version diff · 3 comparisons
What changed between versions
SB145 Original
→
SB145 Act
·
4 edits
MODERATE
The bill was finalized as an Act (Act No. 115) and approved by the Governor, changing its status from a draft proposal to enacted law. The substantive policy content remains consistent, prohibiting the issuance of permits for bulkhead construction in a specific area of St. Tammany Parish from March 17, 2025, to January 1, 2030. The primary change is the formalization of the text, including the addition of signatures and the correction of the geographic boundary coordinates to define the restricted zone more precisely.
Scope change
The bill's scope expanded from a proposed restriction on permits for distributaries of the Tchefuncte River to a broader prohibition covering all water bodies within a newly defined polygonal area in St. Tammany Parish, explicitly including Lake Emfred and Suter Slip.
TIMELINE
The bill status changed from 'Original' draft to 'Enrolled Act No. 115' with Governor approval, making the restrictions legally effective.
SCOPE
The geographic restriction was updated to define a specific polygonal area using precise latitude and longitude coordinates, replacing the previous description of 'distributaries of the Tchefuncte River' to ensure the ban applies to all water bodies within that defined boundary.
DEFINITION
The finalized text explicitly lists 'Lake Emfred and Suter Slip' as included locations within the restricted area to eliminate ambiguity.
TECHNICAL
Minor formatting adjustments were made to align the coordinate data and ensure the legal text matches the enrolled version.
Floor votes · Senate Apr 23, 2025 · House Jun 2, 2025
How they voted
36–0
Passed · 1 other
Total votes 37
Apr 23, 2025
D
Democratic11
100% Yea
R
Republican26
96% Yea
Vote distribution
All Yea
All Nay
Mixed
No data
Full legislative history
Actions timeline
Total actions
18
Key actions
4
Committee
4
Amendments
1
Jun 2, 2025
Lower · Passed
Read third time by title, roll called on final passage, yeas 97, nays 0. Finally passed, ordered to the Senate.
lower
May 22, 2025
Introduced
Reported without Legislative Bureau amendments.
lower
May 21, 2025
Lower · Passed
Reported favorably (13-0). Referred to the Legislative Bureau.
lower
Apr 24, 2025
Committee
Read by title, under the rules, referred to the Committee on Natural Resources and Environment.
lower
Apr 23, 2025
Upper · Passed
Read by title, passed by a vote of 38 yeas and 0 nays, and sent to the House. Motion to reconsider tabled.
upper
Apr 16, 2025
Upper · Passed
Rules suspended. Reported with amendments.
upper
Apr 14, 2025
Committee
Introduced in the Senate; read by title. Rules suspended. Read second time and referred to the Committee on Natural Resources.
upper
1 primary · 0 co-sponsors
Sponsors
Role
Legislator
Party
State
District
P
Patrick McMath
RRepublican
Ask Maddy
·
AI policy assistant
Ask Maddy about SB 145
Scope: LA
Hi! I can help you understand SB 145. What would you like to know?
Try one of these
i
Maddy answers using official bill text and legislative records. Always verify before sharing.
Sources cited inline