SB 592 Florida Senate · 2025 Regular Session

My Safe Florida Condominium Pilot Program

Summary
My Safe Florida Condominium Pilot Program; Limiting participation in the My Safe Florida Condominium Pilot Program to certain structures or buildings; revising the improvements for which a grant may be used; requiring that improvements be verified during the final hurricane mitigation inspection to qualify for grant funds; specifying that mitigation grants may be awarded only for mitigation improvements that will result in a mitigation credit, discount, or other rate differential, etc.
Bill status in committee 1 of 4 stages cleared
Introduction
Mar 2025
Committee Review
Floor Vote
Governor
Introduced Mar 4, 2025 Last action Apr 29, 2025
Maddy AI version diff · 2 comparisons

What changed between versions

S 592 c1 S 592 c2 · 10 edits
MAJOR
This bill version significantly expands eligibility criteria, adds new funding limits and matching requirements, introduces stricter contractor verification, and establishes new conditions for grant disbursement and final inspection. The changes aim to ensure grants are used for improvements that actually reduce insurance costs while preventing duplicate funding.
Scope change
Expanded from only three-story structures to include structures with two or more single-family dwellings, and clarified that grants apply to specific structures or buildings within condominium properties rather than the entire property.
ELIGIBILITY

Changed participation requirements from 'three stories or more' to 'three or more stories in height' and added requirement that structures must contain 'two or more single-family dwellings'.

Modified approval voting requirements from '75 percent' to 'unanimous vote' of all unit owners residing in the structure receiving the grant.

FISCAL

Added specific grant matching requirements ($1 association match for $2 state funding) and maximum award limits ($175,000 per association for combined roof and opening protection projects).

Established specific funding amounts for roof-related projects ($11 per square foot, max $1,000 per unit) and opening protection projects (max $750 per window/door, max $1,500 per unit).

REQUIREMENT

Added requirement that the department must electronically verify contractor license numbers before approving grant applications.

Added new requirement that associations must complete entire mitigation projects and make properties available for final inspection within 1 year of grant approval.

Added requirement that grants may only be awarded for improvements that result in a mitigation credit, discount, or other rate differential.

Added restrictions preventing use of grants for previously installed improvements or insurance claim deductibles.

TIMELINE

Added effective date of July 1, 2025.

DEFINITION

Changed definition of 'condominium' to apply to specific structures or buildings rather than the entire property.

Floor votes

How they voted

No floor votes recorded yet.
Full legislative history

Actions timeline

Total actions
20
Key actions
6
Committee
7
Apr 22, 2025
Upper · Passed
Favorable by- Fiscal Policy; YEAS 18 NAYS 0
upper
Apr 17, 2025
Upper · Passed
On Committee agenda-- Fiscal Policy, 04/22/25, 11:00 am, 412 Knott Building
upper
Mar 27, 2025
Upper · Passed
Pending reference review under Rule 4.7(2) - (Committee Substitute)
upper
Mar 20, 2025
Upper · Passed
On Committee agenda-- Regulated Industries, 03/25/25, 4:00 pm, 412 Knott Building
upper
Mar 4, 2025
Introduced
Introduced
upper
Mar 4, 2025
Upper · Passed
Pending reference review under Rule 4.7(2) - (Committee Substitute)
upper
Feb 24, 2025
Upper · Passed
On Committee agenda-- Banking and Insurance, 03/03/25, 1:00 pm, 412 Knott Building
upper
Feb 20, 2025
Committee
Referred to Banking and Insurance; Regulated Industries; Fiscal Policy
upper
1 primary · 1 co-sponsor

Sponsors