SB 1081 Connecticut Senate · 2025 Regular Session

AN ACT CONCERNING AN ECONOMIC STUDY ON AREAS SURROUNDING THE MOHEGAN-PEQUOT BRIDGE.

SB 1081 requires Connecticut’s Economic and Community Development and Transportation Commissioners to conduct an economic study of areas surrounding the Mohegan-Pequot Bridge in Montville and Preston. The study must assess whether the bridge adequately handles traffic flow, evaluate impacts from nearby projects (like the Great Wolf Lodge and Preston Riverwalk), examine how it accommodates permitted loads excluded from the Gold Star Memorial Bridge, and analyze potential effects if the Gold Star Bridge closes. The study must be completed by July 1, 2026, and report findings to the General Assembly’s transportation committees. This bill directly affects local communities near the bridge and the state’s transportation planning process. It mandates a factual analysis but does not authorize funding or construction.
Bill status in committee 1 of 4 stages cleared
Introduction
Jan 2025
Committee Review
Floor Vote
Governor
Introduced Jan 22, 2025 Last action May 7, 2025
Maddy AI version diff · 1 comparison

What changed between versions

Proposed Bill → Committee Bill · 5 edits
MODERATE
The bill was moved from proposed to committee stage, with sponsors listed in reverse order. The core policy change adds specific geographic details to the economic study requirement, explicitly naming Montville and Preston as affected towns and adding a new requirement to determine if the Mohegan-Pequot Bridge has adequate capacity for those areas. The study scope was expanded to include traffic flow analysis and potential impacts from bridge closures due to public safety incidents.
Scope change
The bill now explicitly defines the geographic scope of the study to include Montville and Preston, and adds a capacity assessment requirement that was not present in the original version.
REQUIREMENT

Added requirement for commissioners to determine if the Mohegan-Pequot Bridge has adequate capacity to serve surrounding areas in Montville and Preston.

Expanded study scope to include analysis of whether the bridge permits convenient, safe, and expeditious traffic flow to surrounding areas.

Added specific analysis requirement for impacts if the Gold Star Memorial Bridge is closed or restricted due to public safety incidents.

TIMELINE

Study results must be submitted by July 1, 2026, with recommendations for bridge rehabilitation.

TECHNICAL

Bill sponsors listed in reverse order; bill number changed from Proposed to Committee Bill with new LCO number.

Floor votes

How they voted

No floor votes recorded yet.
Full legislative history

Actions timeline

Total actions
18
Key actions
3
Committee
5
May 5, 2025
Upper · Passed
Joint Favorable
upper
Mar 12, 2025
Upper · Passed
Joint Favorable
upper
Feb 5, 2025
Committee
REF. TO JOINT COMM. ON Transportation
upper
Feb 4, 2025
Upper · Passed
DRAFTED BY COMMITTEE
upper
Jan 22, 2025
Committee
REF. TO JOINT COMM. ON Transportation
upper
11 primary · 0 co-sponsors

Sponsors