Optimize Colorado Electric Transmission System
What changed between versions
Added a specific definition for 'advanced conductor' requiring at least 15% lower electrical resistance or 60% higher energy capacity compared to standard steel-reinforced aluminum conductors.
Added a new definition for 'grid-enhancing technology' covering tools like dynamic line ratings, power flow controllers, and energy storage used to reduce congestion.
Required utilities to consider and address plans for constructing new powerline trails in coordination with local governments during their ten-year transmission plan updates.
Required utilities to demonstrate compliance with specific state energy resource zone laws in their transmission plans.
Updated the bill header to list additional sponsors and changed the status from 'Rerevised' to 'Final Act' for signature.