SB 1114 Arizona Senate · 57th Legislature - First Regular Session

assured water supply; analysis; availability

SB 1114 modifies Arizona's process for issuing "certificates of assured water supply," which developers need to build new projects. It allows applicants to use existing groundwater analyses or availability determinations made before May 31, 2023, and requires a 15% reduction in reserved groundwater when applying for new certificates. The bill also specifies that water demand assumptions used when the original analysis was issued must be applied to new certificates, preserving the difference for future development. This directly affects developers seeking water rights for new construction projects in Arizona.
Bill status passed 3 of 5 stages cleared
Introduction
Jan 2025
Committee Review
Mar 2025
Senate Passage
Mar 2025
House Passage
Governor
Introduced Jan 16, 2025 Last action Mar 18, 2025
Maddy AI version diff · 1 comparison

What changed between versions

Introduced Version Senate Engrossed Version · 3 edits · Mar 3, 2025
MINOR
The bill was reformatted from an introduced version to a Senate engrossed version with substantive policy changes. The most significant change is the addition of an alternative 'physical AVAILABILITY determination' alongside the existing 'analysis' for demonstrating groundwater availability. Additionally, the emergency provision was removed, indicating the bill is no longer being treated as an urgent measure.
Scope change
The bill's scope was expanded to accept physical availability determinations in addition to analyses for groundwater supply certificates.
REQUIREMENT

Added 'physical AVAILABILITY determination' as an alternative to 'analysis' for demonstrating groundwater availability, allowing more flexibility in how water supply needs are verified.

TIMELINE

Removed the emergency provision that would have made the bill effective immediately, changing it to standard legislative process timing.

DEFINITION

Updated the definition of 'analysis' to include physical availability determinations as a valid method for meeting groundwater supply requirements.

Floor votes

How they voted

This bill passed the Senate by voice vote (no roll call recorded).
Full legislative history

Actions timeline

Total actions
9
Key actions
4
Committee
2
Amendments
1
Mar 18, 2025
Lower · Passed
DP
lower
Mar 3, 2025
Upper · Passed
PASSED
upper
Feb 27, 2025
Upper · Passed
DPA
upper
Feb 4, 2025
Upper · Passed
DP
upper
1 primary · 0 co-sponsors

Sponsors

Role
Legislator
Party
State
District
P
Photo of Tim Dunn
Tim Dunn
RRepublican
AZ
25